5,467 permits · Roofing · NY
Replacement of roof drains and associated piping.
Remove existing Roof drains/piping, replace with new drain, piping and flashing. Re-flash, wire brush, repaint existing vent stack. Replace Fire pump including piping, fittings, valves and controller....
Installing 4 new roof drains and re-flashing of existing vent stack extensions.
Two generators installed in open space. each generator consist of belly tank, main breaker, battery charger, muffler, weatherproof attenuation enclosure.
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q002- replace rooftop gravity ventilators & exhaust fans.
Installation of new sidewalk shed for reso a rooftop playground - ps 290m at 311 east 82 street, manhattan as indicated on plans. there will be no change in the use, egress, or occupancy under this ap...
Installation of a temporarily supported scaffold, overhead and roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with...
Selective roof replacements, parapet replacements, and exterior masonry repairs, along with miscellaneous MEP work related to the aforementioned replacements.
Alt CO filed to combine 2nd floor dwelling units, remove and replace stair bulkhead at roof as per plans.
Decommission of existing T-MOBILE site on the roof. Initial application filed under Job No. B00081867. No change in use, egress or occupancy.
Decommission of existing tmo site. remove equipment platform and dunnage, 12 antennas, 3rrh and 1 gps from roof. remove cables from basement, facade and roof. no change in use, egress or occupancy. or...
Obtain cert. of compliance for existing rooftop hvac unit(s) for apt 5ab, as per plans and specs filed herewith, in accordance with approved -lpc permit cne lpc-26-07406 dated 03-05-2026. see comments...
New (2) 5 ton 'trane' outdoor rooftop units as filed under application #520369761.
Structural work for new steel dunnage installation atop existing roof for new mechanical equipment as per plans filed herewith. no change in use, egress or occupancy.
Waterproofing repairs. No change in use, egress or occupancy.
Reinforce existing interior floor framing and roof terrace framing, design of rear lateral shear walls, and design of new roof dormer. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Filing for a temporary mock up at the roof. No change to use, egress. or occupancy.
Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.