5,467 permits · Roofing · NY
Structural repairs scope of work for existing roof. no change to use, egress or occupancy.
Installation of solar panels, rooftop, railed, grid-tied, 5 modules, 2.05kw
installation of solar panels, rooftop, railed, grid-tied, 8 modules, 3.44 KW
Installation of photovoltaic solar array on existing roof system as per plans
Main Roof Replacement, 7th Floor Terrace Roof Replacement, Mezzanine Roof Replacement, Localized Facade Cladding General Repairs
Existing heating piping removal, new heat pump vrf system, associated ductwork. new toilet exhaust fans on roof, and associated ductwork modifications as per plans filed herewith. no change to use, eg...
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Installation of solar panels, rooftop, railed, grid-tied, 6 modules, 2.64 kw
R450_Remove exist blowers, exhaust fans on roof, and unit ventilators. Provide new Heating and Ventilation Units, roof mounted and interior exhaust fans, and unit ventilators. Add new interior exhaust...
Installation of photovoltaic solar array on existing roof system as per plans
Remove and install partitions, wall furring, flooring, rubber base, wood flooring, steel base, windows, ceilings & soffits, doors/frame and hardware, finishes. provide painting throughout, signage, an...
Installation of solar panels, rooftop, grid tied, railed, 13 modules, 5.33 KW
installation of solar panels, rooftop, railed, grid-tied, 8 modules, 3.44 KW
Replacement of all bathroom, kitchen fixtures, slop sink in janitors closet and roof drains within existing location. new plumbing fixtures at cellar as per plans filed.
Proposed installation of new rooftop unit and ductwork in conjuction with job# b01088385-s1 for suspended gas heaters installation as per plans. no change in use, egress or occupancy @ 1 saint nichola...
Existing Verizon site. Installation of new steel FDNY landing platform on roof as per FDNY requirement on FDNY approval.
Installation of solar panels, rooftop, railed, grid-tied, 5 modules, 2.05kw
Installation of solar panels on roof. no change in use, egress, or occupancy.
Application filed to construct a verticle and horizontal addition to an existing cellar and two (2) story frame two (2) family detached home work to include replacement of existing roof - no change to...
Roof Replacement at 305 East 72nd Street. Installation of vegetated trays at Roof Level. No change in use, occupancy or egress.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com