Search Building Permits
2,081 permits · Demolition · NY
Interior demolition on existing one (1)- family, two (2) story brick residential building with cellar. work on cellar and 1st floor only. no change in use, means egress or occupancy.
Minor interior demolition; Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 7th floor as per plans (Hines - Demo, Whitebox & Stair Infill) No change to...
Interior non-structural demolition as shown on the plans.
Full hand demolition of a 1-1/2 story frame building using handheld devices. foundation to be removed using mechanical means
Temporary bracing and partial demolition of 5 story building, as per plans filed herewith. This application is filed in conjunction with DOB#322109525.
HUB CONSULTATION ACCEPTED. This job is filed for partial demolition work at 134-19 Northern Blvd, Queens NY 11354, In conjunction with AltCO job# Q01175010-I1
Photo studio-- interior demolition inclusive of partitions removals as per plans filed herewith. no change to use, egress, or occupancy.
construction fence will be used to protect site, during full demolition.
installation of construction fence to protect site during full demolition
Interior renovation to include demolition of existing partitions and finishes as shown on plans. No change in use, egress, or occupancy.
installation of construction fence to protect site during full demolition
Application is filed for the demolition of wood deck located in the backyard of the property. no change in use, egress or occupancy. all work as per plans submitted herewith.
exterior renovation to include demolition of existing and construction of new partitions in Storefront - Retail D Space for existing office space. no change in use, egress, or occupancy.
Interior demolition of non load bearing partitions on the 20th floor as indicated on drawings.
Interior demolition of non load bearing partitions on the 20th floor as indicated on drawings.
The proposed demolition is for 2 story masonry garage attached to another garage located within our property that is not attached to residential building. It's not attached to the neighboring building...
Interior renovation to include demolition of existing partitions and finishes as shown on plans. No change in use, egress, or occupancy.
Photo studio-- interior demolition inclusive of partitions removals as per plans filed herewith. no change to use, egress, or occupancy.
installation of construction fence to protect site during full demolition
installation of construction fence to protect site during full demolition