Search Building Permits
2,850 permits · HVAC · NY
Install new hot water boiler as per plans. no change in use, occupancy, or egress.
NYCHA BOILER-CARVER_BLDG #5_Provide a temporary boiler plant to serve the existing facilities during demolition of the existing boiler plant and construction of the new facility boiler plant.
Installation of new thru-wall air conditioning units, new central split mechanical system & related ductwork; new toilet, dryer & rangehood exhaust, as per plans filed herewith.
replace existing ducts with new layout on existing existing HVAC system on portion of the 13 floor (marketed as 14) in conjunction with Alt # M01355130 as per plans filed
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Replace gas fired boiler.
Propose subsequent filing for installation of HVAC System in existing 5-story fully sprinklered building filed in conjunction with Alt-CO # X00870226-I1.
Modifications to the existing HVAC system on the 12th and 25th floors as per plans. No change to use, egress or occupancy.
Proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI)
Mechanical scope for hvac installation of new heating system in building as per plans filed herewith. no change in use, egress, or occupancy.
Nycha boilers- provide split ac unit for ventilation and cooling of engineer's office. provide toilet exhaust fan and relief fan for engineer's office.
Install replacement burner as per plans. filed in conjunction with laa# m01114839-i1-la. no change in use, occupancy or egress.
Construct new elevator building addition. Provide new HVAC units with associated piping and ductwork for new building addition and accessible bathrooms throughout the building.
Filing to address ecb violations 3546158l;35563530y. removal of non-load bearing partitions. removal of kitchenette. legalize 3 fixture bathroom and laundry room. enclose boiler with 1 hour rated part...
Install new air conditioning systems (heat pumps), ventilations systems and heating systems
replace oil boiler with a new gas boiler in cellar, file in conjunction with plumbing Job#M01122840-I1, mechanical and construction job#M01122840-S1. No change in use, occupancy or egress. filed in co...
Installation and removal of piping valving and hangers removal and installation of air handlers ceiling and floor mounted air conditioning units and all associated ductwork. No change in use egress or...
Replacement of HVAC equipment (Vacum pump, condensate pump)
Mechanical/hvac modifications per plans filed. there is no change in occupancy use or egress under this application