168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Proposed roof replacement as indicated on plans submitted herewith. there is no change in use, egress or occupancy.
Carrier: T-Mobile. Modification of an existing antenna site. Replace (6) existing antennas on the roof. Relocate (2) existing antenna sectors along the roof. All work is in conform…
Masonry rebuilding, waterproofing lining of gutters, drain pipe repair related interior repair as per plans filed herewith. no change to use, egress or occupancy to PK110K.
Northwell LIJ Medical Center - Bone Marrow Transplant (BMT) Project: minor structural scope (installation of roof dunnage framing in support of new mechanical equipment) as per pla…
Steel reinforcing of roof stair bulkhead for new cellular antennas. No changes to use, occupancy, or egress.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Installation of new rooftop units and associated refrigerant piping, ductwork, new dedicated vav units, new exhaust fans and associated ductwork, louvers, new water-cooled fan coil…
Installation of temporary roof protection as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
Modification of existing VERIZON site. Replace 5 antennas, remove 3 antennas, and install 1 new sector (3 antennas) and 2 RRH units on the roof.
Direct replacement of two rooftop HVAC package units
Installation of temporary roof protection as per drawings, roof protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Mechanical work at roof to address fdny violation no. 014252480p. no change to use, egress, or occupancy.
Renovation of the 2nd-floor mechanical room, as well as the 3rd-floor setback roof portion where the mechanical equipment is located, is associated with the Mechanical scope. No ch…
Installation of roof waterproofing system as per plan. no change in use egress or occupancy.
Direct replacement of roof top units
Facade repairs and roof railing repair.
Facade and roof repairs as per plans filed herewith. no change to use, egress or occupancy
Replace the existing roof hatch with a guardrail and hydraulic latch of the same kind. No change in use, egress, or occupancy.
Carrier: VZW. New Install. Install (3) antenna sectors on the roof (15 antennas, 6 RRH, 3 OVP & 2 GPS). Install (3) cabinets on a new equipment platform with a guardrail on the roo…
Renovation of existing house of worship, int & ext demo, general construction. removal & replacement of existing facade including ornamental tower/spire, existing arcade & exterior…
Installation of 300 psf sidewalk shed, construction fence, roof of protection and ohp via needle beam as per plans. all equipment shall comply with chapter #33 of the 2022 code. no…