3,953 permits · Demolition
Interior Demolition interior partitions, doors, ceilings and flooring.
Establish use as vacant land per land use code. Demolish one-family dwelling and associated detached accessory structures subject to field inspection [STFI].
EPLAN. demolish 1 SFR to handwrecking method. sewer cap and pedestriane fence is required.
demolition of one-story building. On-site and off-sit fill not to exceed 300 cubic yards.
Total demo of sfr 762 sqft circa 1948
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 8th floor (HITT-Office Buildout) as per plans. No change to use, egress or occupancy.
Demolish two-family dwelling and detached accessory garage per plan. [Work on adjacent property under associated demo permit #7079243-DM.]
Demolition - Interior
suite 1700: demolition of ceiling, scope includes construction of ceiling power and finishes. fire alarm system, fire sprinklers deferred.
comply with nov 202540677 replace (e) fireplace on 2nd fl; demol walls @ 2nd fl; replace interior stairs; dry rot repair
17/f: demolition and construction of men's restroom walls/lighting providing new toilet partition in men's room only. new power, demolition of minimal set of light fixtures, new light fixtures, new fi...
demolish (e) type 5b 2-story single family residence.
Debris chute and mechanical equipment use in conjunction with partial interior non-structural demolition: skid steer loader, track loader, mini loader, demo robots, and mini excavators as per plans.
General construction filed for demolition of interior non-bearing partitions and finishes, as shown on plans filed herewith. No change in use, egress, or occupancy.
Demolish all elec
Interior remodel: Interior remodel of two bathrooms. Tubs are converting to showers. No exterior walls being demolished. Removal of wall between laundry & storage room
Minor demolition with installation of new partitions on the 34th floor as per plans. No change to Use, Egress or Occupancy.
Mechanical demolition on the 17th floor as indicated on drawings.
Interior demolition of interior partition walls, doors and windows, ceiling tiles and finishes
Demolition Sequence & Bracing and Shoring