Search Building Permits
2,078 permits · HVAC · TX
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork
Building 1 2870 sf 2 story single family residence. 3 Bdrm 3.5 Bath pool and spa. Detached 2 car garage with 503 sf one bedroom one bath residence on the second floor
Replacement of complete existing central heat and air system with or without duct work Install replacement of 4 Ton AC System & Repair Or Rebuild Of The Supply Air Plenum
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [5bed 4bath] with Attached Garage.
Site Plan Condo: Proposed construction of 2518 sq ft single-family residence with 3 bedroom 3.5 bathrooms 2 car garage
New construction secondary apartment 1-story with basement 1 bedroom 1 bath with uncovered patio.
Replacement of complete existing central heat and air system with or without duct work
remodel to create lobby office and storage space. This will include mechanical electrical and structural work. The project also includes a new sidewalk and accessible ramp at the exterior of the build...
Partial conversion of existing garage to finish laundry room area and incorporate into overall conditioned space of home
ePlan: Residential Expedited Review - New Accessory use to Primary [1bed 1bath].
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
New construction of SFR Condo with 3 beds 3.5 baths 2 car garage
Replacement of complete existing central heat and air system with or without duct work
Replacement of mini-split system HVAC changeout: replace like-for-like heat pump mini split. No structural change.
Replacement of complete existing central heat and air system with or without duct work double ( up and down )
ePlan: Commercial Expedited Review - Interior Remodel to Existing Admin Office Areas Bldg 3 (103235 SF).
Replacement of complete existing central heat and air system with or without duct work