168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
revision to bpa 202605151329: unit 93: more water damage found on outside deck. repair deck less than 50% repair. back of bldg
to obtain final inspection for work approved under pa#: 202504154415. all work is complete.
revision to 202507020075 & 202602246444: adding an interior landing & stair at e) secondary exit door, no change to use/ occupancy/ area of building. no structural mods
(dmh - pdox) wood landing & steps at front entry of sfd over existing foundation. a footing inspection is required for existing foundations to verify frost depth before installing…
Demo existing bathtub to install walk-in shower in sfd bathroom. install insulation and vapor barrier at exterior wall cavities exposed during construction. install backer at wall…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Wood deck resurfacing and add new steps on south / west elevation walls of existing single family house. aaj (project dox plans and documents) ***note: per applicant, deck already…
convert (e) family room to 2 bedrooms. new mudroom & wetbar on 1/f. all work on 1/f only.
(dmh-pdox) bathroom remodel in sfd. replace fixtures in same locations. no window replacment. install insulation and vapor barrier at exteror conditions. install fiber-cement or gl…
Remodel/Alterations/Repairs
Remove and replace 72.5" x 39.25" concrete stoop landing with steps and install new 4 - 10" diameter frost depth concrete footings on front of existing single family house. aaj (pr…
to renew pa#202410213336
bathroom remodel on 1st floor like for like.
install insulation at front of home, install 1/2" plywood to front of home below the shingles. work is street facing.
R & R, 8 Existing windows, like for like, no structural change
to obtain final inspection for work approved under pa# 202406204825 & 202503172350. all work is complete.
remodel master bathroom on top floor. replace bathtub. replace shower pan replace toilet & exhaust fan. install wall tiles & floor tiles. replace vanity countertop & sinks. total b…
full kitchen remodel with new appliances, we are not changing the layout of existing kitchen, like for like. all work is non-structural only. no wall or framing modifications.
recommencement and completion of work approved under pa# 201711204437.
Siding - House only
recommencement and completion of work approved under pa# 202504164517.