5,372 permits · HVAC · NY
Replacement of existing wall a/c units with new ductless air conditioning systems. no change in use, occupancy, or egress.
Mechanical system work to lobby (a5) as per plans filed herewith. no change to use, egress or occupancy.
Legalize 2 low pressure boilers serving the 1st floor commercial space and the 1st floor residential apt. cap + remove boiler lpb-1 and remove from the required boiler inspection log. no change to use...
Filing to change from oil to gas and install replace boilers and water heaters
Replacement of two (2) existing low pressure natural gas hot water boilers within existing cellar mechanical room. no change in use, egress or occupancy.
Replacement of existing ventilating fans, ductwork and cotnrols
INSTALL REPLACEMENT 2,500-GALLON FUEL OIL STORAGE TANK IN CELLAR AS PER PLANS. REMOVE EXISTING 4,000-GALLON FUEL OIL STORAGE TANK. FILED IN CONJUNCTION WITH LAA APPLICATION No. M01312797-I1-LA.NO CHAN...
Installation of HVAC units proposed for Castle Hill Library. No change to use, occupancy or egress.
Hvac work for lobby renovation as per the plans filed herewith. no change to use, egress or occupancy.
1. repair boiler room floor and provide new finish flooring. repoint interior masonry wall. patch plaster at ceiling. 2.patch and repair exist. plaster ceiling on first floor. 3. remove window pane at...
Removal and replacement of heating and ventilation units, modification of existing ductwork, and installation of new exhaust fans.
Q054_Proposed work for concrete work and finishes related to removing and replacing PL DHWH, piping, and fixtures; to provide single duct risers; and to provide new exhaust fans.
Plumbing work on cellar of existing mixed use building with cap/remove hot water boiler and install hot water heater. no change in use, egress or occupancy.
NYCHA-Sumner Bldg #13 Mechanical Work filed for Replacement of existing vacuum pump & connections, control valve & by-pass valve system. Removal of steam piping to existing DHWH. Install of temp. cond...
Proposed structure work for the existing building and add a one-story vertical extension on top of the existing structure, including a mechanical floor and elevator bulkhead. In conjunction with CO jo...
Replace left hand boiler and gas burner (boiler no. 1)
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Mechanical work in conjunction with tenant fit out.
Replace LP gas fired HW boiler
Modification/addition to existing HVAC ductwork and related piping as shown on drawings. No change in use, egress or occupancy.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com