Search Building Permits
2,850 permits · HVAC · NY
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Mechanical/hvac modifications per plans filed. there is no change in occupancy use or egress under this application
Proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI)
Installation of new thru-wall air conditioning units, new central split mechanical system & related ductwork; new toilet, dryer & rangehood exhaust, as per plans filed herewith.
Propose subsequent filing for installation of HVAC System in existing 5-story fully sprinklered building filed in conjunction with Alt-CO # X00870226-I1.
Provide concrete pads for mechanical and plumbing equipment, openings and reinforcement for boiler rigging and ventilation.
Filing herewith mechanical/hvac installations, additions, and modifications to existing building system as per plans.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Replacement of HVAC equipment (Vacum pump, condensate pump)
Installation and removal of piping valving and hangers removal and installation of air handlers ceiling and floor mounted air conditioning units and all associated ductwork. No change in use egress or...
replace existing ducts with new layout on existing existing HVAC system on portion of the 13 floor (marketed as 14) in conjunction with Alt # M01355130 as per plans filed
Replace gas fired boiler.
Relocate existing boiler room and electrical room from cellar to first floor. minor interiorrenovation associated with mep replacement. facade restoration. sidewalk restoration. aging in place kitchen...
Mechanical scope for hvac installation of new heating system in building as per plans filed herewith. no change in use, egress, or occupancy.
Nycha boilers- provide split ac unit for ventilation and cooling of engineer's office. provide toilet exhaust fan and relief fan for engineer's office.
Install new air conditioning systems (heat pumps), ventilations systems and heating systems
Modifications to the existing HVAC system on the 12th and 25th floors as per plans. No change to use, egress or occupancy.
replace oil boiler with a new gas boiler in cellar, file in conjunction with plumbing Job#M01122840-I1, mechanical and construction job#M01122840-S1. No change in use, occupancy or egress. filed in co...
Modifications to the existing HVAC system and associated ducts and piping on the 13th Floor as per plans. No change to use, egress or occupancy.