22,502 permits · Other · NY
Facade restoration projects, as depicted in the provided plans.
Installation of 600# to 1000# capacity material only hoists as per drawings. hoists shall comply with ch #33 of the nyc bldg code. no change in use, occupancy or egress under this application.
Installation of 4 new deluge sprinkler heads in cooling tower at bulkhead.
Filing herewith mechanical work for the building at the address listed. includes new vrf system, and kitchen, toilet & laundry exhaust systems. natural ventilation provided, refer to ot application dr...
Mechanical specifications filed in conjunction with gc application b01316505-i1
Replacement of existing ventilating fans, ductwork and cotnrols. replacement of existing window ac units.
Installation of new split system unit with associated ducts and piping in Unit 12 AE. Remove and replace existing PTAC units.
Lower vale-reconstruction of outdoor retaining walls at prospect park vale of cashmere. no change to use, egress, or occupancy.
Removal of interior finishes at cellar and 1st floor. Removal of selected portions of 1st floor facades, enlargements of windows and door openings, and new windows, doors, and exterior finish, as show...
The ob-134 oakwood beach wrrf power distribution improvements project includes replacement of existing supply and exhaust fans and associated ductwork in existing maintenance building.
Installation of sidewalk shed and supported scaffold as shown on drawings. no change in use, egress or occupancy. we shall comply with chapter 33 of 2022 b.c
Filing plans for the installation of new alpolic panels, exterior cladding, and metal stud overframing. No change to use, egress, or occupancy.
Installation of construction fence along property lines. no change in use/occupency, egress, room count/dwelling units
Installation and provisions of systems, equipment and services for a pre-k center, including electric cabinet unit heaters, perimeter electric wall pressed convectors,split system air-cooled heat reco...
Furnish & install new sprinkler booster pump, associated FCVA, sprinkler/standpipe risers and piping (Harry Winston Infrastructure) as per plans. No change to use, egress or occupancy.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Installation and use of temporary knuckleboom as per plans filed herewith. No change in use, egress, or occupancy.
Installation of sidewalk shed at 1309 washington avenue, bronx, ny 10456 as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of suspended scaffold for facade work or inspection.
Vertical & horizontal extension of existing one family house. obtain new c of o