168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Renovation which includes the work of partition wall, window, doors, ceiling and relocation of kitchen and bathroom. adding one more bathroom on each floor. no change in egress and…
Capping of gas line at kitchen appliance. Replacement of plumbing fixtures. Relocation of plumbing fixture.
Filing Plumbing application subsequent to the approved primary job number B00973395-I1
Propose plumbing work at existing commercial space as per plan. no change in use, egress or occupancy.
Plumbing modifications for interior renovation of Apartment 9H on the 10th floor as shown on drawings filed herewith. No change in use, egress or occupancy.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Remove and replace 8 roof drains. Re-flashing for existing vents at roof level.
Replace bathroom fixtures on existing roughing, replace kitchen sink, replace gas stove
Plumbing work for proposed house of worship.
PL work type in conjunction with job#322088012
Propose plumbing works on 1st floor as per plan. no change in use, bulk, egress or occupancy.
Propose plumbing works on 1st floor as per plan. no change in use, bulk, egress or occupancy.
Filing for renovate existing commercial store. installation of new plumbing equipment and relocation of existing handwash sink and lavatory.
Proposed plumbing work at cellar, remove existing oil tank, replace hwh and boiler. install new plumbing fixtures. filed to address ecb violation 39188583l and 39188584n. filed inc…
Plumbing work filed on the 1st floor in the rambam family health center in conjunction with dob now gc, sp and mh. no change to use, occupancy or egress.
Interior renovation of apartment #3E. Modification to kitchen and bathroom fixtures and appliances. No change in use, egress or occupancy. In association with GC application #M0118…
Interior plumbing work in unit 202a, at the 2nd floor, associated w/ ot application #b01415667-i1. no change in use, occupancy, or egress.
Plumbing filed for tenant fit-out on first floor
Renovation of the existing plumbing & sprinkler system on 7th flr to adjust to the new floor layout. scope of work does not change use, egress or occupancy
Modifications to the existing plumbing fixtures and related piping on the 10th and 11th floors as per plans submitted herewith.
Filing for plumbing & sprinkler work associated with interior reno of 26th floor stikeman & elliot office as per plans submitted herewith.