2,095 permits · Demolition · NY
Partial Demolition of East Facade to create access opening for construction hoist
Full demolition to a one story building
Change in certificate of occupancy 1)converting light manufacturing space to eating and drinking establishment 2)partial demolition of first floor to create new 1 story enlargement in rear yard. 3)new...
Demolish 2 story detached house. On-site and off-site fill not to exceed 300 cubic yards.
Full demolition of existing 1-story accessory garage in rear yard.
Full demolition to a one story building
Demolish detached garage. On-site and off-site fill not to exceed 300 cubic yards.
Emergency Work Order - 71 ft high, Chimney Demolition to resolve Complaint #3A42120 in coordination with DOB's Forensic Engineering Unit. Work was completed last month under Forensic Engineering Unit'...
Minor interior demolition. Installation of new interior partitions, suspended ceilings, flooring and finishes on the 17-18th Floor as per plans (Lowenstein Sandler LLP - Renovations.) No change to use...
Renovate existing 2-family dwelling. Scope includes demolition of and installation of non-load-bearing walls, ceilings, and finishes on the first and second floors. Filed to address violation 3916974K...
Replacement of existing gas dryers in existing laundry room. minor non-structural demolition of interior partition walls. no change in use, egress, or occupancy.
Interior demolition of non load bearing partitions on the 1st floor and modification of existing storefront as indicated on drawings.
Interior renovation existing 2 story building.work in cellar, 1st and 2nd floor. demolition work and construction work as per plan. partition, flooring, ceiling and painting throughout. no change in e...
Refiling an old demo application, BIS Job # 301007988, for sign off purposes only. Demolition has been fully completed.
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition
Partial Demolition of East Facade to create access opening for construction hoist
Engineered Enclosure System on Scaffolding for Full Building Demolition
Interior demolition on existing three (3)-family, three (3) story residential building with basement &cellar.no change of building bulk, occupancy or egress.
Phase 2: Partial Demolition Means & Methods for park and garage/parking structure as per plans.
Alteration to create new accessory amenity spaces for the building tenants from portions of the existing 3rd and 4th floor office spaces. scope of work to include general construction inclusive of dem...