168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Remove 2 mc cable from electrical panel and run on wall surface that are not properly install ,about 40ft each
De la cruz elect
2231 Menefee
ePlan: Commercial Expedited Review - New Installation of Tracking Equipment and Inspection (500 SF)
Home builders loop Ref: 2026-059264 EP
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
ePlan: Commercial Expedited Review - New Installation of Tracking Equipment and Inspection (500 SF)
Install roof mounted solar array (22 panels)
Support of excavation only for electrical conduit to be filed separately
Temporary Meter Loop #T2
Jose Arnaldo
Minor repair
ePlan: Commercial Expedited Review - New Installation of Tracking Equipment and Inspection (500 SF)
ePlan: Residential Expedited Review. New Three Unit Residential: Building 3: New construction of a 3-Story Single Family Res. [4bed 3.5bath] with att
The scope of work includes the renovation of a one bedroom apartment; new bathroom ; new kitchen. all new electrical and plumbing. carpentry work, including new floors and partitio…
*PB* New construction of 2 Story SFR with attached garage and covered patio and porch 4/3
New Service for SFR in ETJ.
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 1 . lighting outlets: 1. specific location: swimming pool.
Electrical maintenance permit. occupancy: business. start date: 6/1/2026. end date: 7/1/2026. all work under this permit must be performed by employees of the listed electrical con…
Install new panel in 1st floor server room and new transformer on 2nd floor mezzanine
Interior alterations to electrical systems, lighting & controls for new office tenant renovations