168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
to renew pa#202110221023
to renew pa#202412036015
Replacing 1 Front Entry Door (No change in rough opening)
26.35 SQ. Re-Siding - Vinyl
Remove/replace entry door - same size for size
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
kitchen remodel. demo wall to expand kitchen. rip and replace cabinetry to new design. update mep as needed per code.
installation of 2 bays and 1 puttview area. retail area. new non-structural partitions.
(13 SQ) SCOPE: Full House Siding
Replacing 17 windows & 1 double sliding patio door- No changes to rough openings
powder room refresh: new paint, new vanity, replace toilet. all work in-kid.
install of new accesible ramp and stairs and interior glazing.
1/fl-unit 104-removal of 7 ft walls erected w/o permit. return restroom to gender neutral accessible restroom. partial height walls and associated doors. removal of unpermitted tab…
second floor: to comply with n.o.v. #200564030.to legalize existing unauthorized dwelling unit through udu program.to legalize as-built: bedroom 1& 2, bathroom 1 & kitchen. change…
(n) rear yard patio and deck max. 6 feet above (e) grade
interior remodel of both 1st & 2nd floor with 1st floor infill below (e) 2nd story at the rear. removal of rear exterior stairs, new finishes & appliances included. new bath, kitch…
convert 1st floor front storage room to conditioned office (148sq.ft.) add 1st floor front aluminum clad sliding window for light and ventilation. upgrade access to office room 1st…
bathroom remodel and removal and replacement of (e) finishes in kind. no wall removal or layout changes.
voluntary seismic strengthening. make 2259 fillmore st. structurally independent of 2261 fillmore street.
bathroom remodel to include new bathtub relocating toilet, replacing sink, adding closet to the existing entry hall.
floors 17 and 18 - replace elevator lobby doors, frames, and hardware to address tenant security concerns.