168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
T/I - 6TH & 7TH FLOOR const type: IB occupancy: B 2020 MSBC occupant load: 71 (6TH), 80 (7TH) architect: 57258 - Eder, Jared Michael @ STUDIO BV
Remodel warehouse into cannabis cultivation and processing facility -ACW certificate of occupancy required no special inspections required no const type: IIB occupancy: F-1,B 2020…
(dmh - pdox) 30 x 24 detached garage with interior stairs to room-in-attic trusses.- 2020 irc-4 2-layer grade d paper required under stucco exterior per irc. provide proper address…
(dmh - pdox) reconstruct 5'-4"x6'-6" concrete landing at front of sfd over 1 new pier footing. a footing inspection is required for existing foundations or new footings to verify f…
Replace 3 windows
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Replace front stoop and steps. minimum landing size 36" by 36" hand rail must be 34" to 38" above nosing of treads (required if 4 or more risers) 7 3/4" maximum rise allowed and 10…
remove/replace 12 windows; no structural changes
replace living room window same size opening
(DMH-ProjectDox) Construct 2-Story S.I.P's Single Family Dwelling with unfinished basement. 24x 24 Det Garage. Full Plan Review fee this permit for Master Plan. 2020 MNSBC/2018 IRC…
main front entry door and storm door
We are rebuilding the top 15-feet of exterior masonry on the chimney.
Build new ramp & retaining wall at exterior 2020 msbc architect: 51553 - laverdure, michael richard lee @ dsgw
(dmh-pdox) kitchen remodel in sfd. frame closed 1 window. relocate window over sink. other minor interior wall framing. install insulation and vapor barrier at exteror conditions.…
SUITE 950. INTERIOR TENANT IMPROVEMENT. (JJL) certificate of occupancy required: no special inspections required: no const type: I-B occupancy: B 2020 MSBC occupant load: 66 sprink…
Remove and replace 1 entry door same size no structural change
Complete tear off/ replacement of siding materials on the dwelling and detached garage. Wrap 2 service doors, garage service door, garage door and 1 window wrap. New gutters on hou…
Construct/replace stoop and steps on front of existing sfd. minimum landing size 36" by 36" hand rail must be 34" to 38" above nosing of treads (required if 4 or more risers) 7 3/4…
Removal and Replacement of two exterior doors. No change in size or location.
Add small powder room in basement. Addendum to previous permit application (BLDG1163002). Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 Fuel-fired ap…
Vinyl Siding First and Second Floor- House Only