168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
This Alteration application is being filed for the mechanical work on Cellar, Basement, 1st thru 3rd floors and Roof. There are no change in use, egress or occupancy under this app…
Restaurant with mechanical work on 1st floor and roof.no change in use,means of egress or occupancy in this application.
Installation of Paint Spray Booth & Mixing Room, Duct work from units up to roof for Exhaust, Installation of Dry Chemical Fire Suppression. No change to CO, Egress, or Occupancy.
Installation of new non-emergency gas generator on the roof. No change in use, egress or occupancy.
scope of work is limited to the rear and side facades of the building and includes sealant replacement , masonry repointing and replacement, masonry and waterproofing of lintels.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Installation of 300 psf sidewalk shed and roof protection as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under th…
Proposed mechanical works only on open space , cellar, 1st, 2nd, 3rd floor, roof. as per plan. in conjunction with dob now gc job no: q00738280-i1.
Filed herewith to repair and replace the roofing system at 3rd floor penthoutse and roof. no change to use, egress or occupancy.
Application herewith filed to erect front enlargement at 1st floor and install a roof over existing deck at rear of 1st floor. No change to use, egress or occupancy.
Install new pavers and railings on 4th floor roof at rear for new terrace. Repair of existing rear masonry wall. No change in use, egress or occupancy.
Nycha throggs neck houses bld. #8 - installation of +/-920 lf of 8'-0h temporary chain link construction fence, as per plans, for roofing replacement project. there will be no chan…
Temporary roof protection at adjoining property during bldg demolition, filed sep under app # m01412252. temporary roof protection shall comply with ch #33 of the nyc bc. no change…
Erect enlargement in the rear yard. and bulkhead at roof level . filing for the patch and repair of damaged surfaces throughout and apply new paint. no change to use, occupancy or…
Suspended scaffold outriggersystem and materials hoistsystem for roof repairs,replacement, inspections and facade restoration works
General construction modifications related to generator enclosure / noise mitigation screen on the 7th floor roof per plans. no change in use, egress, or occupancy.
Structural framing for the interior of the townhouse and partial roof framing as per plans filed herewith. no change to use, egress or occupancy.
T-Mobile modification -Install 12 antennas and 6 RRU's units on the roof., Remove 9 antenna on the roof.. Install 2 new cabinets on existing steel platform on the roof.. Related se…
School Roof Replacement
Installation of 300 psf sidewalk shed and roof protection as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under th…
Exterior facade repairs and maintenance work including brick, mortar repointing and waterproofing throughout and as necessary. All work as per plans submitted. No change in use, oc…