168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Nycha boiler general construction in the cellar as per plans filed herewith. no change to use, egress, or occupancy.
Replacement of one (1) ptac unit at existing sleeve in facade, and one (1) ptac unit at new facade opening are rear.
HVAC installation of apartment 15B. No change in use, egress, or occupancy.
Mechanical work
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
At 7th floor tenant space, additions/modification to existing mechanical system as per plans filed herewith. no change in use, egress, or occupancy.
Mechanical scope associated with commercial renovation as per plans filed herewith.
mechanical equipment will be used to assist with full demolition of structure.
Temporary work platform as per drawings. work platform shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Removal and installation of ductwork, diffusers, fans and related mechanical piping. no change to use, egress, or occupancy.
Mechanical work as shown on plans filed herewith.
Proposed modifications to the existing Mechanical System as per plans submitted herewith. No Change to Use, Occupancy, or Egress.
Mechanical changes as indicated on plans.
Replacement of boiler and associated controls, combustion air, and flue.
Installation of (2) new low pressure boilers and burners for dual fuel operation. no change in egress or occupancy.
Mechanical work of existing 3-family building as per plan filed herewith. no change in use, egress or occupancy.
Install chimney liner and replace boiler breeching.
Partial demolition of 176 Remsen St, using hand held and mechanical means to assist
General renovation of proposed doctors office on 3rd floor with new partition, door, ceiling, flooring and painting, mechanical work with replace/new diffuser as need as per plan.…
Replacement of boilers and associated controls, combustion air, and flue.