5,372 permits · HVAC · NY
mechanical modifications on 11th floor as per plans filed herewith. no changes in use, egress or occupancy.
Mechanical work as shown on plans for Apt 5A as well as mechanical closet.
Install new gas-fired steam boiler for heating in cellar.
Mount sinai - kp4 satellite pharmacy expansion - mechanical modifications as per plans filed herewith. no change in use, egress, or occupancy.
Hvac modifications for 9th floor commercial space.
Installation of a 5 ton, water cooled, Climatemaster A/C unit with a single line supply air duct layout, ceiling return air grilles, and condenser water supply & return piping and condensate drain on...
Mechanical equipment use for partial demo (bobcat s250 skid-steer loader, hyundai r210lc-9 hydraulic excavator, brokk 110 hydraulic breaker, jlg 650 boom lift (or equivalent approved by engineer) for...
Mechanical work in conjunction with Alt CO
Existing (1) 4.5 ton split system and ceiling exhaust restroom fans to remain. New (1) 3 ton split system along with new ductwork proposed.
Provide Lintel for wall penetrations. Provide house keeping pads for mechanical equipment.
Mechanical work as shown on plans filed herewith.
Subsequent filing for mechanical works; remove all existing radiators and install new water cooled heat pump units with ductworks and condenser water piping.
Spear - modification of hvac.
Mechanical work taking place on the 21st floor as per plans filed herewith. no change in use, egress, or occupancy.
Proposed mechanical work including but not limited to relocation of existing air handling units and new duct work for new tenant banana republic. no change to use, egress, or occupancy.
hereby filing to remove existing mechanical equipment and ductwork as shown on plans filed herewith. No change to use, occupancy or egress.
Install 6 new under the window and 1 ducted package heat pump units for apt 7a. install kitchen hood and bathroom ventilation as per plan. no change in use egress or occupancy.
Modifications to existing mechanical systems and associated ducts and piping as per plans filed herewith. no change in use, egress, or occupancy.
Mechanical work on the 17th floor (corridor/lobby/boardroom) as indicated on drawings.
Installation of mechanical HVAC system, ventilation duct work. Mechanical scope only.