168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Restoration repairs due for property damage as a result of a tree fall. revised work scope 3/23/2060
Replacing permit b4613715 finishing finals - no review bldg permit replacing permit b4613715 finishing final for subs and builidng permit
REF ZONE-055984-2025-Repairing home after house fire to original condition.
• Renovations to existing Corridors and Common area rooms (no work in Residents rooms). Includes: l
INTERIOR RENOVATION - UNITS A, B, C & D All interior and exterior walls and partitions to remain, no
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
No exterior footprint is changing. Kitchen and Mudroom/Laundry remodel. Footings per engineered pl
Scope of work: interior alteration ste 107 501 sf buildingn is 1 story mixed occ 2=b const sprinkle
Nc overhead door alterations level ii interior alterations to existing suite 105 mixed occ b & s-1i
Study Renovation
Complete remodel of 2 bathrooms, strengthen floor joists with LVL's and remove partial beam in base
Arepa Culture Change of use from an existing automotive repair shop to fast casual restaurant (A-2)
Whole home interior renovation & enclosing existing covered back porch patio (sunroom conversion) Se
Renovations to existing Corridors and Common area rooms (no work in Residents rooms). Includes like
Construct screen porch over existing deck on rear of house. Repair parts of exisiting deck that has
2 story addition on right side of home, 1 story addition on left front side of home. Renovating exi
Interior alteration of the main floor kitchen, living room, laundry room. Move laundry to second flo
This project consists of the renovation of a kitchen and creation of a scullery. The proposed kitch
No review bldg permit repair and replace existing 12x10 deck, extend deck another 12x10 add deck cover
American Tower Modular Data Center Phase 2 - Addition to Unmanned Modular data storage facility. Pro
PONY REVIEW STE 200 B OCC -2681 SF Interior alteration of existing vanilla shell business tenant s