168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Filing herewith an Alteration Type CO application to change the use of a portion of the cellar and first floor from Use Group 6 to Use Group 9A, including associated modifications…
Proposed change to metes and bounds, full interior renovation, and conversion to 2-family.
Removal and installation of interior non bearing partitions and related finishes as per plans filed for 41st floor.
Suspended scaffold outrigger system for exterior facade restoration work and inspection at 377 broadway, manhattan, ny 10013
Remove and replace partitions, casework, cabinets, window shades, furniture and equipment, flooring, and finishes. plaster patch and paint walls and ceilings
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Interior structural work on 3rd and 4th floors as indicated on plans filed herewith for apartment combination
Filing for structural work for the repair of the parking garage as per plans. no change in use, egress or occupancy.
9th cycle FISP repairs. No change to use, occupancy or egress.
interior renovation replacement of sheetrock and finishes throughout. combination of two apartments at basement level as per TPPN #3/97
This application is to remove existing ceiling tiles and non bearing partition walls and wall finishes to verify the siteconditions
Facade repairs as per plans filed herewith. no change in use, egress or occupancy
Renovation of existing retail store. no change in use, egress, or occupancy.
Limited to repair of existing exterior facade elements of 6-story nycha multiple dwelling as part of the nycha pact renovation in conjunction with required local law inspection (fi…
Limited to repair of existing exterior facade elements of 6-story nycha multiple dwelling as part of the nycha pact renovation in conjunction with required local law inspection (fi…
Installation of suspended scaffold and material hoist for exterior facade repairs and facade inspection. suspended scaffold and material hoist shall comply with chapter 33 of the 2…
renovation of residential building including apartments combination on floors 2nd and 3rd floors, relocaiton of egress stair on the 4th floor, exterior work includes facade work an…
Repair or replacement of stucco; decorative stone; mortar joints on the facades as per indicated on plan.
Repair or replacement of stucco; decorative stone; mortar joints on the facades as per indicated on plan.there will be no change in use, egress, or occupancy under this application…
General construction to include the addition of 121 square feet to the 1st floor in the form of a horizontal enlargement. no change to use, egress or occupancy.
Replacement of wood flooring, wall padding, interior finishes, and telescopic bleachers, doors and hw, and associated finish work in gymasiums s 1 & 2 (boys' gym) on the first floo…