168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Structural work related to the installation of a new stair bulkhead & new stair to the roof as indicated on the drawings filed herein. filed in conjunction w/ gc #m01283781-i1.
Obtain certificate of compliance for existing a.c. roof top unit. no change in use, egress or occupancy under this application.
Replacement of existing rooftop unit(s) with new unit(s). No modification to existing interior ductwork, registers, or diffusers. No change in occupancy, use, or egress.
Nycha throggs neck houses bld. #7 - installation of approximately +/- 219 lf temporary heavyduty sidewalk shed, as per plans, for roofing replacement project. there will be no chan…
Alterations to existing 4-story + cellar building, including new roof bulkhead and change of use for cellar and roof. obtain new certificate of occupancy.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Application filed to indicate two new units to existing mechanical system on the roof.
Nycha throggs neck houses bld. #7 - installation of +/-1140 lf of 8'-0h temporary chain link construction fence, as per plans, for roofing replacement project. there will be no cha…
Replacement of rooftop air conditioning unit. All existing duct work to remain. No change in use egress and occupancy.
Selective Demo/Removal HVAC Work, New Sheet Metal Work/Ductwork/Duct Accessories/Dampers. (1)-New 3-Ton VRF Indoor, 1-New 1.5 Ton VRF Indoor, 1-New 5-Ton Outdoor Condensing, 2 New…
Filing for installation of temporary modular tent on rooftop as per plans submitted herewith.
Install new non-emergency generator on the roof. No change in use, egress, or occupancy.
Installation of new VERIZON site. Install 4 sectors (16 antennas), 16 RRH units, 4 MDBs, 3 GPS units, and a new platform with 3 cabinets on the roof. Related conduits from roof to…
Installation of 1 access ladder to roof and new guardrail on roof. No change in use, egress, or occupancy.
Modification to T-Mobile site - Replace 3 antennas on the roof. Install 3 RRU on the roof.
Garage and garage roof repairs as per plans submitted herewith. there is no change in use, egress or occupancy.
Q179- replacement of all roofs, roof access doors, partial exterior masonry replacement. concrete & crack repair, interior plaster repairs& new parapet mounted guard rail.
Drawings are filed to renovate an existing 2-family dwelling. remove & replace existing non-load bearing partitions with new partitions, new steel stair to roof, & new interior fin…
Rear yard slab repair, waterproofing installation, and masonry repair.
mechanical work for existing apartment on 5th and 6th floor - unit placed on roof
Roof top split system unit hvac replacement for existing building as per plans here within. no change to egress, use or occupancy.