168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
New cannabis store. "tree house longfellow". prior to receiving your certificate of occupancy, a mechanical permit or letter from mechanical designer/contractor is required stating…
Tenant improvement for message therapy wellness -ACW certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2020 MSBC occupant load: 29…
Replace 46,000 SF of ACT, 2 new doors/walls, and generator enclosure -ACW certificate of occupancy required no special inspections required no 2020 MSBC architect: Bagley, Sarah An…
Re-roof flat roof 2020 msbc
Water restoration at portions of Level 1 and Level 2 -ACW certificate of occupancy required: no special inspections required: no 2020 MSBC windows with sill heights less than 36 in…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
rebuild 2 billboard structures. engineer: voss #58110
Wrecking CPED owned commercial building no PDR. A PDR and/or construction permit has not been submitted or approved. Therefore, any excavation left after the removal of the buildin…
Remodel restrooms and add restroom -ACW certificate of occupancy required: no special inspections required: no const type: IA occupancy: B 2020 MSBC sprinklered: yes Floor(s): 18th…
Facade siding repair -ACW certificate of occupancy required: no special inspections required: no 2020 MSBC
New cannabis store. mechanical permit required, or submit letter to minneapolis inspector signed by a licensed mechanical designer/contractor stating all mechanical systems meet cu…
Interior demolition of finishes, no other work 2020 msbc
RE-ROOF FLAT ROOF 2020 MSBC architect: 60490 - Behrens, Kaliann Rose @ INSPEC
WINDOW REPLACEMENT This permit authorizes the removal and installation of 4 windows. (sza) 1. For one- or two-family dwellings, windows installed under this permit shall meet the r…
Change of occupancy. taproom and brewery (separate buildings). storage is not permitted in large portion of lower level. does not meet habitable requirements. one exit from lower l…
Bathroom remodel -ACW certificate of occupancy required: no special inspections required: no 2020 MSBC windows with sill heights less than 36 inches above the floor shall be equipp…
remodel/change of occupancy 1st floor corner space for retail cannabis sales. certificate of occupancy required: yes const type: 5b occupancy: m 2020 MSBC occupant load: 19 sprinkl…
T/I FLOOR 18 const type: IA occupancy: B 2020 MSBC occupant load: 363 sprinklered: YES architect: 59613
8x5 bathroom remodel unit 1014.
#3550 interior tenant finish. certificate of occupancy required: no const type: 1a occupancy: b 2020 MSBC sprinklered: yes architect: hustad #17408
layover new roof membrane.