168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Interior renovation of an existing single-family townhouse. Work to include demolition of non-structural partitions, installation of new non-structural partitions and related finis…
Interior demolition of non structural building components. no changes in use, egress, or occupancy.
Demolition of existing non-loadbearing walls.. Construct new walls, relocate kitchen, modify and relocate bathrooms and enlarge connecting stair between floors. Replace existing wi…
Legalization of residential garage demolition
Interior renovation to include interior demolition of non-bearing partitions and finishes in existing space as shown on plans filed herewith. No change in use, egress, or occupancy…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Partial demolition of a portion of the existing 2 story building
Perform minor interior demolition & construction inconjunction with 16th floor apartment renovation. reconfigure bathrooms, kitchen & closets. install new lighting. no change to us…
Full demolition to a two story house
Minor demolition with installation of new partitions on the 30th and 31st floors (Norton Rose) as per plans. No change to Use, Egress or Occupancy.
Demolition of existing concrete platform and storage tanks at cellar and 1st floor. scope of works as shown in plans. no change in egress, occupancy or use.
Demolition of the shed in rear yard - accessory to residential house, filed in conjunction with one family house demolition application #b01348593
Interior non-structural demolition and removals as shown on plans.
Interior demoltion of non-load bearing partitions, fixtures, and finishes.
Application filed for Partial demolition means and methods And Temp shoring & stabilization of a 4 story building, in conjunction with ALT-CO filing M01129209-I1.
Full hand demolition of existing two story detached building.
Demolition of partitions, floors and ceilings of office on the 8th floor. The tenant will construct the space under a separate application.
Full demolition on existing 1-story garage in rear yard.
Filing herewith interior demolition on the 38th to 39th FL. (36th to 37nd FL. Construction, 38th to 39th FL. Marketing) as per plans filed herewith. No change to use, egress or occ…
Interior renovation / modifications and demolition as per plans filed herewith. No change to use, egress, or occupancy.
Limited to interior demolition to existing apt # 5B ON THE 5TH FL. Remove non-bearing partitions & interior finishes, removal of all windows and installation of temporary window pr…