Search Building Permits
419 permits · Electrical · CA
interior remodel with new kitchen, 2 new bathrooms, replace windows/doors in-kind per st. francis wood hoa guidelines/approval letter. convert 583 sf of (e) space to an adu per ca state program. note:...
bathroom remodel like for like, replacing valves, tiles, vanity, toilet, update electrical all switches, outlet replacment to censor one. and plumbing valve replacement.
mou proj-26-0630: installation of 1 new custom canopy including shade structure at (e) playgrounds on nw corner. work includes excavation, per engineered lans. no electrical, plumbing or mechanical wo...
21st floor: interior ti - non structural partitions, doors, lighting, accustical ceilings, new finishes, electrical and mechanical.
4th floor: limited interior demo & construction of non-strucutral elements ~ partitions - finishes, electrical outlets, ceiling treatments, lighting & switches & restroom upgrades. scope does not affe...
deferred electrical for ste 435 basement office ti under permit 202507150851.
recify nov 202429598. remove interior walls, remove bathroom, remove kitchen stove, remove any unpermitted electrical work @ garage level
16th fl mechanical and electrical work for ti ref pa 202601214196
add a new greeter desk focal wall to the existing lobby area. existing beverage bar to be removed and new closet added. scope of work includes typical electrical modifications as needed. ther are no p...
Supplemental Permit to 19010-10000-02374 to move the location of the DAS room from electrical room 106 to MPOE room 233
remodel of (e) garage level to include addition of junior accessory dwelling unit within the building envelope of (e) building. work to include (n) bathroom, (n) kitchenette, (n) windows & 1 exterior...
kitchen renovation in kind, bathroom renovation in kind, tub to shower, all new fixtures. replace electrical panel. no layout change, no wall stud framing demolition
4 bathroom rebuilds like for like after water mitigation, install insulation, drywall reset tub and intall tile flooring and paint no change to layout or electrical or plumbing
revision to pa # 202512172021: relocate 1 full bathroom on the g/f. change tub to shower to the full bath at 2/f. no upgrade to electrical service panel.
22nd floor. mechanical and electrical for tenant improvement on the 22nd flr. ref#: 202512111537
Demo existing patio cover (14'x15.5') and replace with new aluminum solid patio cover (11'x16') per pre approved standard plan ICC ESR 2676 with electrical.
upper unit like-for-like interior remodel. replace kitchen and (2) bathroom fixtures. no structural changes, no relocation electrical, or mechanical systems, electrical upgrade outlets, switches (gfci...
apt 2: remodel ktichen & bathroom in-kind. new plumbing and electrical fixtures as needed.
1 aluminum illuminated/electrical, 2 face sign. sign name as "chalk"
electrical permit # ew202511201026 repaint and replace sheetrock around electrical panel