168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Removal and restoration of all non-bearing interior partitions, appliances, floor & ceiling materials, and electrical components in fire-damaged apartment 30a. no change to use, eg…
Non-structural interior demo on floor 48m/45c, including removal of interior finishes, ceilings, wall panels, electrical devices, elevator cab finishes, call buttons, and call lant…
Proposed enlargement to existing 1 story and cellar medical facility to address swo 3a42679. installation of fire alarm.
Install washer machines and electric dryers for building tenant's accessory use at cellar. work includes plumbing piping, dryer venting, and installation of new sprinkler heads off…
Removal and restoration of all non-bearing interior partitions,appliances, floor & ceiling materials, and electrical components in fire-damaged apartment 18a. no change to use, egr…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Removal. replacement and reconfiguration of kitchen and bath appliances, fixtures, millwork and finishes. Reconfiguration of existing entry and corridor closets to accommodate new…
Install washer machines and electric dryers for building tenant's accessory use at cellar. work includes plumbing piping, dryer venting, and installation of new sprinkler heads off…
Application being filed to show 21st Floor residential amenity lounge seating replacement, minor electric and lighting scope with finish updates in designate area. No change in use…
Installation of chargers for electrical vehicles in parking lot
Install fire sprinkler system as per plans.
Install fire sprinkler system as per plans.
Install fire sprinkler system subsequent to GC (-I1) job. The system is hydraulically calculated.
New wall partition in existing commercial space to create new layout for new tenant.Minor electrical work.No change in use , occupancy or means of egress
Install new fire sprinkler system in the entire building i.a.w. nfpa 13d 2016 edit, as modified by nyc bc 2022 appendix q as per plan, in conjunction w/ nyc dob now job# b00900310.
Excavate and remove one (1) 4,000-gallon gasoline ust, one (1) fuel dispenser, fire suppression system and vr tls-350r. install one (1) 4,000-gallon dw frp gasoline ust, one (1) fu…
Install fire sprinkler system as per plans. Replace existing fire pump with new fire pump.
Install fire sprinkler system as per plans. Replace existing fire pump with new fire pump.
HUB consultation accepted on 5/9/2024. Alteration within 72 units and common areas and exterior facade. Removal of non-load bearing walls. Replacement of fixtures, doors, partition…
Install new fire sprinkler system in the entire building i.a.w. nfpa 13d 2016 edit, as modified by nyc bc 2022 appendix q as per plan, in conjunction w/ nyc dob now job#: b00905775…
Installation of an underground electric property box and underground secondary electric service to the existing building for a new tenant, with associated site work.