168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Lo…
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Lo…
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Lo…
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Lo…
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Lo…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Grading for new pad/vault and trenching for new electrical conduits. ***ELECTRICAL/MECHANICAL EQUIPMENT UNDER SEPARATE PERMIT***
Supplemental to permit no. 25010-30000-00140 to capture mechanical, electrical, and plumbing permit fees.
Add sill plate anchor bolts, add plywood to cripple walls (if existing), and replace foundation per L.A. City Standard Plan #1 (Earthquake hazard reduction per Chapter 92 of the Lo…
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Lo…
***eplan **change of use from motion picture production studio (f-1) to storage/warehouse (s-1). no changes in parking requirements. no exterior changes to the building or site.
Add sill plate anchor bolts, add plywood to cripple walls (if existing), and replace foundation per L.A. City Standard Plan #1 (Earthquake hazard reduction per Chapter 92 of the Lo…
revision to pa#: 202512010636. reduce scope by deleting wind wallroom and associated equipment. (n) hvac equipment. lan room layout. update finishes and equip anchoring. power upda…
tenant improvement for detnal office including non bearing partitions walls restrooms, ceiling and soffits, plumbing, and mechanical work
ePlan: New mechanical storage building. (185sf)
Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer(s) and a separate express electrical permit for new pool luminaire is required, when applica…
(1) Kitchen and (1) Bathroom remodel for residential buildings (no structural changes) INCLUDING ELECTRICAL, HVAC AND PLUMBING.
Complete work done under previously expired permit #____21010-10000-06847____. Work is ___95___% complete (Minimum 75% percent completed as determined by inspection). INCLUDING ELE…
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Lo…
ePlan: New mechanical storage building. (81sf)
Add sill plate anchor bolts, add plywood to cripple walls (if existing), and replace foundation per L.A. City Standard Plan #1 (Earthquake hazard reduction per Chapter 92 of the Lo…