Search Building Permits
10,157 permits · Plumbing · NY
This plumbing application is filed in conjunction with nb application number b01241131-i1 to add new fixtures
This plumbing application os filed in conjunction with nb application number b01241382-i1 to add new fixtures
Plumbing work filed in conjuction with alt-co as per plans filed herewith.
Plumbing specifications filed in conjunction with gc application b01061260-i1
Plumbing modifications to commercial space as per plans. no change to use, egress or occupancy.
Saint john villa: subsequent civil plumbing work type for phase ii site preparation of a new school complex. job filed in conjuction s01144839, s01149913, 500877063
Remove existing fire water service point of entry piping and provide new secondary backflow prevention and meter assemblies. Modify local branch cold water piping and sanitary drainage. Provide sprink...
Interior plumbing work as shown herewith. no changes to egress, occupancy or use.
Herewith filing alteration in conjunction with alt # q01108749-i1for plumbing work in cellar, first, second & osp as per plans filed.
Plumbing work as shown herewith. no changes to egress, occupancy or use.
Plumbing filed in conjunction of 20-story nycha multiple dwelling as part of the nycha pact renovation: replacement of existing kitchen and bathroom fixtures on existing rough in, no change to use, eg...
Job filed exist. commercial space install/remove new plumbing fixtures per plan.no change of use, egress or occupancy under this application.
Modifications to existing plumbing and sprinkler systems in existing 37th and 38th floor office space. no change to use, occupancy or egress
Plumbing work only in conjunction with application #b01355225-i1
Plumbing work on the 10th floor (Ramboll) as indicated on drawings.
Installation of plumbing fixtures as per the plans filed herewith. no change in use, occupancy or egress.
Plumbing work related to the interior renovation to existing 2 family dwelling,alteration 1 (alt-co) to convert 2 family to 1 family dwelling., interior renovation to 1st and 2nd floor,new rear yard d...
Herewith filing for apt 3a interior renovation. work is to modify plumbing fixtures as per plans filed herewith. no change in use, occupancy or egress.
Job filed for plumbing work in conjunction with gc application for medical office at first floor. work includes installation of five (5) new non-res-sinks and two (2) new toilets on new roughing.
Pl filing in conjunction with interior alterations. new 3pc bathroom at cellar. reloc. washer, gas dryer, h.w.h. and service sink. reloc. kitchen sink at first floor.