Search Building Permits
5,472 permits · Roofing · NY
Perform minor exterior demolition & construction inconjunction with penthouse a renovation. replace terrace doors, windows & pavers. modify existng masonry openings. install awning. install hvac scree...
Remove and replace existing roof drains and partial associated storm piping.
Interior renovation of 1 family brownstone at basement, 001, 002 and roof. minor structural work as per plans. no change in use, bulk, occupancy or egress.
Plumbing Work for Roof
Removal and replacement of roof membrane systems of all roofs as shown on drawings. no change in use, egress or occupancy.
installation of solar panels, rooftop, railed, grid-tied, 11 modules, 4.785 kw
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Installation of temporary roof protection as per drawings, roof protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Replace existing rooftop mechanical equipment. replace existing interior air handlers and humidifiers, and assoicated piping. no change to use, egress or occupancy.
New foundation work for renovation of existing home including sistering and reinforcement of existing floor/roof joists throughout, reframing of existing horizontal enlargement and new dunnage for new...
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Modification to existing T-Mobile site. Replace 9 antennas, Install 6 RRU's and remove 9 RRU's on the roof. Install 1 cabinet and replace 1 cabinet on the roof.
Sistering and reinforcement of existing floor/roof joists throughout, reframing of existing horizontal enlargement and new dunnage for new mechanical condensers on existing roof.
Exterior restoration: limestone unit replacement, limestone patching, soft joint replacement, cast stone patching, new flashing and waterproofing at 6/f setback and misc. repairs as per plans on floor...
Installation of temporary roof protection as per drawings, roof protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Replacement of sheetrock throughout the cellar, first, and second floor. install the new dunage on the roof for the condensing units. there will be no change in use, occupancy, or egress.
Cooling & heating spaces w/wall mounted, ductable split units & provide new air terminals. Install Heat Pumps, VRF units, refrigerant piping, ductwork, supply/return registers, bath/shower fans, goose...
Rooftop Solar Installation. No change to use, occupancy, or egress.
Installation of 300psf sidewalk shed, roof protection and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this a...
Installation of 300psf sidewalk shed, roof protection and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this a...