168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
City Funded Demolition 1. CURB-SIDE DEMOLITION. Remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing. 2. Contract term 60 days. Start…
Total demo of sfr 1584 sqft circa 1964
Full demolition application of a 1 high story brick and steel with concrete building.
City Funded Demolition 1. CURB-SIDE DEMOLITION. Remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing. 2. Contract term 30 days. Start…
ePlan. Demolition Of (E) Detached Carport in place of (N) ADU. Replacement parking not required per AB 2097
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Demolish existing one family dwelling per plan. Includes removal of detached garage.
Establish use as vacant land per land use code. Demolish one-family dwelling per plan. Includes removal of (1) detached accessory structure (garage).
Total demo of 2377 SqFt SFR circa 1946
Demolish warehouse buildings (whses 1 3 7 6a 6b 6c 5a 5b 4 and three buildings east of whse 4 stock room and two accessory storage buildings) per plan.
Demolition - Single Family
Demolish 2-story S.F.D. & 1-story detached garage.
Full demolition to a one story building
Int demolish
File job for demolition of car garage @ rear yard.
Total demo of SFR 2917 sq ft circa 1947 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification r
full demolition of fire damaged two story structure, under DOB & HPD Accelerated Emergency Declaration.
This legalization app is filed to show the demolition of select interior partitions on floors cellar through 15 that should have been included under interior demolition application…
Partial demolition and renovation at 232 east 32nd street.
Dog cage demolition
Interior renovation & combination of coop apartments #11A & #11B. Work to include non-structural demolition, general constructions & related finishes, as per plans filed herewith.…