168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Eplan: (n) addition to the rear of sfd, demolish (e) attached patio and interior remodel
Demo sfd with attached garage
ePlan. Demolish 12'x6' double faced offsite sign (takedown credit applied to LA Metro TCN FF-21).Double faced sign with 72-sf panels.OSSPIP Case #297867.originall permit#75la67880
ePlan. Demolish 12'x6' double faced offsite sign (takedown credit applied to LA Metro TCN FF-21).Double faced sign with 72-sf panels.OSSPIP Case #291744.original permit#1974LA98874
Standard-Demolition:3028/Canon - PENINSULA: Demolition permit for the proposed demolition of a 2,664 SF mixed-use building (2-bedroom apartment and attached deck on second floor, c…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
ePlan. Demolish 12'x6' double faced offsite sign (Takedown credit applied to LA Metro TCN FF-21).Double faced sign with 72-sf panels.OSSPIP case #300221.original permit#75LA03171
ePlan. Demolish 12'x6' double faced offsite sign (Takedown credit applied to LA Metro TCN FF-21.Double faced sign with 72-sf panels.OSSIP Case #296613.original permit#80LA03401
Demolition of garage ( 20'-4" x 20.-3").ab2097
ePlan. Demolish 12'x6' double faced offsite sign (takedown credit applied to LA Metro TCN FF-21).Double faced sign with 72-sf panels.OSSPIP case #295773original permit#75LA4802
ePlan. Demolish 12'x6' double faced offsite sign (Takedown credit applied to LA Metro TCN FF-21).Double face sign with 72-sf panels.OSSPIP case #290172.original permit#1974la95041
Eplan. demo the (e) sfd with attached garage
ePlan. Demolish 12'x6' double faced offsite sign (takedown credit applied to LA Metro TCN FF-21).Double face sign with 72-sf panels.OSSPIP case 261160.original permit#73LA66124
unit #4: demolish (e) bathroom, walls and floor to beams. remove part of (e) wall between bathroom and closet. move toilet and sink, build new wall for shower. lower ceiling by 5 i…
Eplan: ti to exisitng office space. interior non-structural demolition and improvement. new non load-bearing partitions, ceilings, finishes, and interior doors.
Standard-Demolition:2372/Harcourt - SERRA MESA: Demolition/Removal Permit for a 8 feet-deep swimming pool at the rear of an existing SDU. RS-1-7
Demo (e) garage
Expedite Program-Discretionary Project:1828/Grand - PACIFIC BEACH (Process 2) Coastal Development Permit to demolish (2) existing one-story residential buildings, to construct an a…
Demolish (e) S.F.D and detached garage w/rec room
demolish 1-story, type 5, mixed use, commercial and residential.
3/f suite 302: demolish (e) construction to accommodate new construction. work includes new non bearing interior partitions and doors, hard ceiling and modify (e) suspended ceiling…