168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
New construction in-ground pool.
Complete Service Rebuild. Like for like.
411 Parland
Fire sprinkler
Disconnect/reconnect to tie in ESS components. We are not upgrading the size of the service not upgrading the meter size.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
New service, panel, and ev chargers in parking lot for new housing
New Service for SFR in ETJ.
Repairing damaged underground or replacing damaged underground
Service upgrade like for like for units 101 103 and 103 1/2 W. Milton. Meters are mounted on the building.
Temp power
New Service for SFR in ETJ.
Homebuilders loop for New SFR ref 2026-054657 BP. Austin Full purpose
Install circuit for EV charging receptacle.
Electrical upgrade service
200 amp overheated main panel replacement electric provider: Austin Electric
Interior remodel: Interior remodel of two bathrooms. Tubs are converting to showers. No exterior walls being demolished. Removal of wall between laund
Arturo scott
Bao Vu
General Wiring
New construction single-family residential 2-story w/ habitable attic 4 bedroom 3.5 bath with attached 2-car garage covered front porch and covered re