13,740 permits · HVAC
General-Express-Building Construction:9353/Clairemont Mesa - KEARNY MESA ; Building, Electrical, Mechanical and Plumbing Permits for a proposed Tenant Improvements to an existing commercial building....
Installation of new hvac systems & ventilations systems along w/ associated ductwork & piping as indicated on the drawings filed herein.
L-4 CARDIOLOGY Phase 4 : HVAC MODIFICATIONS TO ACCOMMODATE THE PHASE 4, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
Reach 7 - Temporary relocation of the HVAC system. Once construction of the proposed area is done, HVAC will be restored back to its original location. No change to use, egress or occupancy.
Mechanical modifications to include hvac replacement and replacement of associated ductwork. no change in use, egress or occupancy.
HVAC tenant fit-out including installation and replacement of air conditioning and ventilation equipment, associated ductwork and piping, and related controls within the existing ground-floor tenant s...
Rapid Review-Standard-Building Construction:4370/La Jolla Village - UNIVERSITY; Building, mechanical, electrical, and plumbing permits for interior tenant improvements to the 5th floor of an (E) (10)-...
General-Express-Building Construction:5607/Alleghany - SKYLINE-PARADISE HILLS: Building, Mechanical, Electrical, and Plumbing permits for the proposed detached 3-story multi-family structure inclusive...
Modifications to the existing HVAC system and associated ducts and piping on the 32nd Floor (EQT), as per plans. No change to use, egress, or occupancy.
Replace existing AC system
Install new A/C system
Repair gas lines and proposed ceiling mounted gas furnaces.
Installation of new boiler as per plans filed. No change in occupancy, use or egress.
Install new h.w.h., boiler, bathroom and kitchen fixtures in the existing 2 story building. plumbing works as per plan. no change in egress, use, or occupancy.
Installation of new boiler as per plans filed. No change in occupancy, use or egress.
HVAC tenant fit-out including installation and replacement of air conditioning and ventilation equipment, associated ductwork and piping, and related controls within the existing ground-floor tenant s...
L-4 CARDIOLOGY Phase 4 : HVAC MODIFICATIONS TO ACCOMMODATE THE PHASE 4, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
Replace existing gas boiler, hot water heater and dryer in the cellar. construct a new three-fixture bathroom in the cellar. replace existing residential stove on first floor and install new plumbing...
Nycha boilers-
1) installation of gas furnaces with split system dx coils for heating and cooling. 2) installation of exhaust and erv systems for ventilation.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com