168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Mechanical application filed subsequent to Alt-GC, job number: B00869572-I1.
Replacement of boilers and associated controls, combustion air, and flue.
Instillation of new mechanical systems as shown on plans filed herewith
Temporary work platform as per drawings. work platform shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Mechanical work and hvac unit installation in conjuction with alt-1 application 123700637
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Partial demolition of 176 Remsen St, using hand held and mechanical means to assist
Installation of (2) new low pressure boilers and burners for dual fuel operation. no change in egress or occupancy.
Mechanical changes as indicated on plans.
Fuel Tank integral to Generator
Massimo dutti - mechanical modifications as per plans (sub-cellar and 1st floor). no change in use, egress or occupancy.
work includes install new heat pump air conditioning, stampers, vibration isolators, switch, steel dunnage, vfd, starters, controls, heaters, balance new fans and outlets, provide…
Installation and use of temporary knuckleboom as per plans filed herewith. No change in use, egress, or occupancy.
Nyt-reconfiguration of cogen heat rejection system inclusive of silencer replacement and related mechanical piping modifications as per plans filed.
mechanical equipment will be used to assist with full demolition of structure.
Removal and installation of ductwork, diffusers, fans and related mechanical piping. no change to use, egress, or occupancy.
Installation of overhead protection as per plans. overhead protection shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Mechanical work as shown on plans filed herewith for the cafe space. No change to use egress or occupancy.
Installation of temporary storage as per plan. there is no change in use, egress, or occupancy.
Installation of temporary overhead protection as per plan. there is no change in use, egress, or occupancy. the overhead protection on the 219 east 44th street building south eleva…
General renovation of proposed doctors office on 3rd floor with new partition, door, ceiling, flooring and painting, mechanical work with replace/new diffuser as need as per plan.…