unit 101 & 103 - remodel (e) bathroom & (e) kitchen; unit 102 - relocation of (e) bathroom & (e) kitchen; unit 104 - remodel (e) bathroom, relocation of (e) kitchen, conversion of (e) kitchen into (n)...
ste 700: demo (e) ductowork as required. furnish and install vrf split systems, funrish and install: new ductwork, refrigerant piping, condensate drain, grilles, registers, diffusers. air balance.
#304: revision to pa#202602176000: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls.
to comply with nov 202541988 revision to pa #201911197709. to reflect as build to show location of skylight, correction to window size, update stairs railing in house , remove one door, update back ya...
unit 2216: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.
#809:rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.
rear foundation underpinning and addition of a sump.
at&t modification of an (e) wireless facility consisting of: r/r 3 antennas; 12 converters and 1 rectifier & 1 netsure 512 retrofit kit in (e) dc power plant
bathroom remodel in-kind fixtures.
administrative ref pa 202512222366 remove deferred permits fire alarm system & fire sprinklers
replace existing metal egress stairs in kind. in the lightwell @ the south side of the building, visible from the street, due to significant corrosion
safe off controls vavs and ddc controls. reconfigure duct work to match new partition plan. furnish and install galvanized steel duct distribution. furnish and install grilles, registers, diffusers. c...
revision to pa#202511240277: replace all windows at all levels, replace (e) garage door with (n). replace floor finish at 3rd floor deck and rear yard ptio. new operable gates at driveway, remove rear...
to obtain final inspection for work approved under pa# 201812047373 ad 202308154454. all work is complete.
4th fl - ti include demo of non-structural partitions and building new non-structural partition. all new or revised. meps and life safety work will be design build and submitted separately. (bldg is f...
unit 1486 - 2nd fl: demo all (e) construction back to framing, add bedroom, new kitchen, additional bathroom, all new mech system & structural upgrades. no bldg envelope changes, no sq ft added.
swap kitchen & dining room location, remodel bathroom; add bedroom 3 in rear of building(previous playroom), rebuild gallery level with code compliant ceiling heights & stairs, legalize all areas on l...
basement - reinforce basement structure below (n) opening created on 1st fl; 1st fkm 1174 - remove partial partition wall @ living rm; new arch opening @ living rm; replace closet door into sliding do...
unit #1: interior remodel in 1st floor - add a media room, a bedroom, a full bathroom, a laundry closet for unit #1. 2nd floor - add a rear deck
to obtain final inspection approval for fire sprinkler for work approved under 201810294439. all work is complete