168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
work includes install new heat pump air conditioning, stampers, vibration isolators, switch, steel dunnage, vfd, starters, controls, heaters, balance new fans and outlets, provide…
Mechanical work as shown on plans filed herewith for the cafe space. No change to use egress or occupancy.
Installation and use of temporary knuckleboom as per plans filed herewith. No change in use, egress, or occupancy.
Mechanical work as shown on plans filed herewith.
Proposed modifications to the existing Mechanical System as per plans submitted herewith. No Change to Use, Occupancy, or Egress.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Partial demolition of 176 Remsen St, using hand held and mechanical means to assist
Massimo dutti - mechanical modifications as per plans (sub-cellar and 1st floor). no change in use, egress or occupancy.
Mechanical application filed herewith in conjunction to alt-co application b01295398-i1
Installation of (2) new low pressure boilers and burners for dual fuel operation. no change in egress or occupancy.
Nyt-reconfiguration of cogen heat rejection system inclusive of silencer replacement and related mechanical piping modifications as per plans filed.
Installation/modification of mech equipment as indicated in the plans filed herewith. installation of new heat pump forced air heating system, new heat pump system for forced air c…
Modification of existing ductwork.
Filing herewith fuel-oil storage and piping system as per plans. Work associated with mechanical application M00981292-I1
Replacement of boilers and associated controls, combustion air, and flue.
Drawing affected: Architectural: A-101.01 ,A-103.01 . Mechanical: M301.01 ,M303.01, M304.01, M503.01. P-001.01,PD201.01,P-101.01,P-103.01, Structural: FO-101.01,S-201.01 ,S-301.01…
Installation of overhead protection as per plans. overhead protection shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Mechanical work herewith being filed in conjunction with alteration application # b01297964
Temporary installation and use of a debris chute associated with construction operations for the controlled removal of non-hazardous debris. Filed to correct Violation No. 03954742…
full demolition of one-story structure, using mechanical means.
New installation of 1 exhaust vent in connection to gas dryer in basement level. to comply with violation #34931398x