6,682 permits · New Construction
erect 4-story, type 5b, 2-family residential building, each unit with 3-bedrooms, per sb423.
erect a (n) type v-b, 3-story building with 2 residential units.
New Construction - NEW CONSTRUCTION OF A FOURTEEN (14) STORY HIGH RISE BUILDING WITH RESIDENTIAL BALCONIES AND COMMON AMENITY ROOF DECK FOR USE AS A SHELL COMMERCIAL SPACE (USE REGISTRATION & FIT-OUT...
New Construction - NEW CONSTRUCTION OF A DETACHED THREE (3) STORY BUILDING (BUILDING 1) FOR USE TWENTY-FOUR (24) DWELLING UNITS AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED. *2018 IBC REVIE...
New Construction - NEW CONSTRUCTION OF A DETACHED THREE (3) STORY BUILDING (BUILDING 3) FOR USE TWELVE (12) DWELLING UNITS AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED. *2018 IBC REVIEW* **...
New Construction - NEW CONSTRUCTION OF A DETACHED THREE (3) STORY BUILDING (BUILDING 2) FOR USE EIGHTEEN (18) DWELLING UNITS AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED. *2018 IBC REVIEW*...
New Construction - NEW CONSTRUCTION OF A ONE (1) STORY DETACHED BUILDING WITH DRIVE THROUGH FOR USE AS A TAKE-OUT RESTAURANT AS PER APPROVED PLANS. BUILDING NOT REQUIRED TO BE SPRINKLERED. SEPARATE AM...
New Construction - FOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13R THROUGHOUT THE ENTIRE BUILDING WITH A NEW 2” FIRE SERVICE AND EXISTING 4" BACKFLOW PREVENTION ASSEMBLY...
New Construction - FOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13R THROUGHOUT THE ENTIRE BUILDING WITH 2” FIRE SERVICE LINE CONNECTED TO A FOUR (4) INCH FIRE SERVICE MAIN...
New Construction - FOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13R THROUGHOUT THE ENTIRE BUILDING WITH A NEW 2” FIRE SERVICE AND EXISTING 4" BACKFLOW PREVENTION ASSEMBLY...
New Construction - FOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13R THROUGHOUT THE ENTIRE BUILDING WITH A NEW 2” FIRE SERVICE AND EXISTING 4" BACKFLOW PREVENTION ASSEMBLY...
New Construction - FOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13R THROUGHOUT THE ENTIRE BUILDING WITH A NEW 2” FIRE SERVICE AND EXISTING 4" BACKFLOW PREVENTION ASSEMBLY...
New Construction - FOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13R THROUGHOUT THE ENTIRE BUILDING WITH A NEW 2” FIRE SERVICE AND EXISTING 4" BACKFLOW PREVENTION ASSEMBLY...
New Construction - FOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13R THROUGHOUT THE ENTIRE BUILDING WITH A NEW 2” FIRE SERVICE AND EXISTING 4" BACKFLOW PREVENTION ASSEMBLY...
General Earth Disturbance ONLY - SITE WORK ASSOCIATED WITH NEW CONSTRUCTION DRIVE THROUGH RESTAURANT (SEE PERMIT CP-2025-005677) AS PER APPROVED PLANS. NO WORK TO RIGHT-OF-WAY ON THIS PERMIT. *2018 IB...
Retaining Wall - EZ PERMIT STANDARDS RETAINING WALLS - For New Retaining Walls as per attached standard. Deviations from these standards require submission of construction and site plans.
New townhouse including foundation, walls, doors, and finsihes.
New townhouse including foundation, walls, doors, and finsihes.
New townhouse including foundation, walls, doors, and finsihes.
New townhouse including foundation, walls, doors, and finsihes.
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com