168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Minor Interior renovation of existing apartment #2b on the 2nd floor. Architectural / Construction work only.
Herewith filing for the replacement of drop ceiling on same location and patching and repairing interior walls. no change in use, occupancy or egress
Gut renovation of existing garage at the rear yard. there is no change in use, occupancy or egress.
Interior reno of non-load bearing partitions, walls, door, ceiling and finishes as indicated on plans.
Filing for tenant-in-place facade repair and window replacement. No change in egress, zoning, use, or occupancy.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Filing for Tenant-in-Place Facade Repair and Window Replacement. No change in egress, zoning, use, or occupancy.
Garage repairs as per plans no change in use, egress, or occupancy.
Interior renovation for two existing apartments, units 1E & 6D. No apartment combination proposed. No change in use. egress or occupancy.
Kitchen and bathroom renovation in existing apartment on the 5th floor. general construction work. no change to use, egress or occupancy.
Sprinkler work as per plans filed. Filed in conjunction with alteration# M01233602-I1.
New foundations at proposed rear addition for a single-family home. No change to use, occupancy and egress.
removal and rebuilding of masonry walls in isolated locations throughout the building. repair stone sills, window guards, steel angles and restoration ties per plans herewith. no c…
Interior renovation including replacement of all interior non-load bearing sheetrock walls & joists within existing locations. no change to building layout. no change to envelope o…
Install exterior non-illuminated d/f blade sign on wall (the people's theatre)
General Construction for interior renovation of Apartment 8G on the 9th floor as shown on drawings filed herewith. No change in use, egress, or occupancy.
Submitting plans for emergency repairs response to complaint #2442476 / DOB violation # VIO26-01491. Restoration of damaged exterior facade at existing McDonald's restaurant, as pe…
Structural work including concrete repair.
Exterior restoration project as per plans filed herewith. no change to use, egress or occupancy.
Concrete, masonry and steel repair on levels 1 and 2 of Pier 40.
Exterior restoration as per plans filed herewith. no change to use, egress or occupancy.