168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Replacement of roofing, windows, and doors of unconditioned clifton gate pressure regulation building for national grid. per section 28-105-4.3 of nyc ac, public utility gas work s…
Installation of temporary roof protection as per plan. no change in use, egress, or occupancy.
Replacement of existing rooftop unit with new
No change in egress, occupancy, or use. Reinforcement of the underside of the 2nd floor slab. Installation of new 2nd floor ceilings and partitions. Replacement of the 3rd floor ro…
Installation and use of temporary overhead, roof and mechanical protection as per plans filed herewith. no change to use, egress occupancy under this application.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Roof repair no change to occupany, use or egress.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Structural demolition taking place on the 1st, mezz, 2nd, and 3rd floors and on the roof as per plans filed herewith. no change in use, egress, or occupancy.
Installation of a temporary roof protection as per plans in conjunction with general construction. no change in use, egress or occupancy. roof protection to comply with 2022 nyc bu…
Roof replacement and minor facade repairs as per plans. No change to use, egress, or occupancy.
Decommission of existing tmo site. remove equipment platform, 12 antennas and 6 rrh from roof. remove cables from cellar, facade and roof. no change in use, egress or occupancy. or…
Mechanical work taking place on the 1st, mezz 1, 2nd, and mezz 2 floors and on the roof as per plans filed herewith. no change in use, egress, or occupancy.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy. shall comply with chapter#33 of 2022 nyc building code.
Replacement of rooftop hvac units. no change to egress, use, or occupancy.
Window repair, pointing and placement of helical masonry ties, in-kind roofing shingle replacement, and painting at exterior north facade of existing church apse
Installation of temporary roof protection as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
Nycha throggs neck houses bld. #2 - installation of approximately +/- 124 lf temporary heavyduty sidewalk shed, as per plans, for roofing replacement project. there will be no chan…
The scope of work of this interior rehabilitation includes but not limited to the replacement of fenestration at living rooms, new roof with pv solar panel system (filed under sepa…
Direct replacement of (5) rooftop hvac package units on existing roof curb