168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Eplan: for structural review of anchorage for pv system
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Installation of PV solar on existing roof no change to egress or use of occupancy
solar permit: ballasted: n, including 1 energy storage unit, of 600 vac, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | 13.5kwh storage system ( 1 ess )
Rooftop solar installation. no change to use, occupancy or egress.
Express- Mechanical/Electrical/Plumbing Standalone:5231/Calle Rockfish - OTAY MESA : Electrical Permit for the proposed photovoltaic system of 3.08 KW DC and BESS of 13.5 KWH to an…
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Installation of solar panels, rooftop, grid tied, railed, 7 modules, 3.045 KW
Installation of PV solar on existing roof no change to egress or use of occupancy
Rooftop Solar Installation. No change to use, occupancy, or egress.
Sonya Tenner
Installation of solar panels, rooftop, railed, grid-tied, 45 modules, 19.575kw
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.