168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Reroof -ACW certificate of occupancy required: no special inspections required: no 2020 MSBC windows with sill heights less than 36 inches above the floor shall be equipped with fa…
Replace radios on telecom site -ACW certificate of occupancy required no special inspections required no 2020 MSBC engineer: Alexander, Paul Timothy
T/I OFFICE - SUITE 200 const type: IIIB occupancy: B 2020 MSBC occupant load: 85 sprinklered: YES architect: 44768 - Dean, Christian Daniel @
New drain tile -ACW certificate of occupancy required: no special inspections required: no 2020 MSBC windows with sill heights less than 36 inches above the floor shall be equipped…
REPLACE WINDOWS & SIDING 2020 MSBC WINDOW REPLACEMENT This permit authorizes the removal and installation of _30__ windows. 1. For one- or two-family dwellings, windows installed u…
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Units 200 and 301 water damage repair. (jjl)
Change of use from Professional Office to Personal Care Services, Fitness Studio. Applicant states updates to paint and light fixtures. No expansion of building footprint. POC: Cor…
To establish a Beer and Cigarette Market, no prior retail use established prior to Sept 19, 2025 (Effective date of Ord #BL2025-908). Prior use Professional Office (Permit #2017080…
Interior renovation of approximately 8,101 square feet within the existing auditorium. No changes to the existing exit capacity are included in this scope of work. No change of use…
Interior renovations of existing Take Out Restaurant with new take out window. Interior demo to create a vacant shell building and other site work under permit #T2026014156. No cha…
Interior renovations to existing condo unit #225. No change to building permit. POC: Darcy Byrnes 615.852.5280
Proposed vertical enlargement to an existing two (2) story + cellar commercial building, converting to a six (6) story + cellar mixed-use building.
Pour Intentions 675 W. Peachtree St 205
PruittHealth Peachtree Site Improvements
N-ZONE
Conversion of exist'g manufacturing into mixed use residential and commercial bldg. under the provisions of the nyc loft law. no change to floor area, bulk, yards or height under t…
ePlan: Commercial Expedited Review - First Time Finish Out For 2nd floor. Future B or M Occupancy. (23163 SF)
Removal of non-bearing interior partitions in existing commercial building with general construction in cellar, first floor through fifth floor. No change of use, egress or certifi…
ePlan: Commercial Expedited Review - First Time Finish Out For 1st floor and Mezzanine - Showroom and Sales Office (23163 SF)
Qt - replace 5 windows like for like at existing commercial residence - ova