Search Building Permits
2,850 permits · HVAC · NY
Replace existing HVAC riser sets including associated insulation, wall / soffit openings, restoration, & access doors. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Ps 009m, installation of temporary boiler breeching / stack, steam, and condensate piping submitting on behalf of contractor in conjunction with dob # 103652370. no change in use, egress, or occupancy...
Herewith filing subsequent fuel storage document for NB generator
K050, installation of temporary chimney, steam, condensate, and water piping to connect temporary boiler during renovation of main building heating plant in nyc public school in conjunction with dob #...
L-4 CARDIOLOGY Phase 3: HVAC MODIFICATIONS TO ACCOMMODATE THE PHASE 3, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
Js 123x, installation of temporary chimney, steam, condensate & makeup water piping to connect temporary boiler on behalf of contractor in conjunction with dob # 201204972. no change in use, egress, o...
Installation of new temporary steam piping and condensate piping for temporary boilers as per plans filed herewith.
Filing to address ecb violation# 39072412m, legalizing rear deck, replace ceiling joist at 3rd floor apt# 3r, install minor partition to enlarge boiler rm at cellar fl, interior finishes throughout ce...
Modifications to existing HVAC system, new split systems
File construction work to remove partitions and install new boiler room as per plan. no change in use, egress or occupancy.
To install new ductworks and air devices throughout the space and connect to existing HVAC units and Mechanical work for the exhaust hood in the commercial kitchen of an eating and drinking establishm...
Proposed vertical and horizontal to existing two story and cellar, one-family dwelling. interior renovation. new partitions, finishes, doors, windows, kitchen cabinets, and new hvac as per plan
Installation of new HVAC equipment and ductwork
Proposed installation of HVAC units, exhaust duct, SS Hood, and exhaust fan, including all incidental general construction work associated with the mechanical installation.
Subsequent filing to submit boiler work type for installing (6) residential boilers and remove existing boiler #69842 in the cellar.
Installation of new boiler at cellar floor. no change to use, egress or occupancy. application previously filed & approved under x00490662-z1, however was filed as replacement instead of new installat...
1A Elev.: Modification of HVAC equipment and ductwork to accommodate alteration to the existing elevator doors and lobbies as per plans. no change to use, egress or occupancy.
Modifications to the existing HVAC system on the the 34th floor as per plans. No changes to Use, Egress, or occupancy.
Modification to existing HVAC systems as per plans filed herewith. No change in use, egress or occupancy.
Modifications to existing HVAC system and ductwork including installation of new AC units. No change in use, egress or occupancy.