2,065 permits · HVAC · TX
new constructions - construction of 2 story accessory dwelling unit rear of main house 2/2
New Shell Addition to Existing Hospital -5 Floors with Future Expansion of 3 Floors- Level 4 to Remain in Shell Condition for Future Finish Out (6) Applications
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Bldg 2: New two story residence with 2-car carport living space is above carport 1.5 bath 1 bedroom. Part of 2-unit use.
express - replacing like for like flooring cabinets and siding. paint inside and out. new hvac. tub to shower. adding lights in kitchen.
Replacement of complete existing central heat and air system with or without duct work change out - 4 ton 15 seer gas system
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Interior Alteration of approx. (5580 sq ft) of Existing Interior Space - Floor 2
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 1838
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 337
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
***Timed Virtual Inspection: 04/03/2026 @ 8 AM*** Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Finish Out for 2nd Floor 30608 SF - remodel to connect to existing hospital 1320 SF
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork
7 DAY - Interior remodel of existing office space. splitting one suite into two (100 and 115) with a common corridor (FLR1)