168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Structural modifications for new mechanical equipment, canopy, lofts, and bulkhead extensions.
Proposed new two (2) story, two (2) family building with cellar. obtain a certificate of occupancy.
Temporary engineered enclosure system for adjoining property protection
Hereby filing to demolish ductwork and relocate and install ac units with related piping as shown on plans filed herewith. NO change to use, occupancy or egress.
mechanical equipment to assist with demolition
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Hereby filing for the installation of (1) new air cooled condensing unit & (2) new air handling units, including all associated duct work & grilles. removal of existing radiators a…
Installation of netting as per plan.
Mechanical work at existing eating and drinking est. installation of erv. no change in use, egress or occupancy.
BE: Provide New Fuel Tanks for Generators. No change in Use, Occupancy, or Egress.
full demolition of one-story structure, using mechanical means.
Mechanical modifications taking place on cellar as per plans filed herewith. no change in use, egress, or occupancy.
Interior renovation for new pizza restaurant, new counter and commercial kitchen/ no change or egress occupancy
Modifications to the existing HVAC system on the 1st floor (BOA) as per plans. No change to use, egress or occupancy.
Mechanical equipment use
Montefiore medical center interior renovation first floor - mechanical modifications as per plans filed herewith. no change in use, egress, or occupancy.
Installation of temporary overhead protection as per plans. no change in use, egress or occupancy.
provide new central air coinditioning systems for the 4th, 5th & 6th floors. no change in use or egress.
Modifications to existing mechanical system as per plans filed herewith.
Mechanical modifications taking place on the 16th fl construction/17th fl marketing floor as per plans filed herewith. No change in use, egress or occupancy
130/25 install 3 additional condensing boilers