168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of new plumbing fixtures & associated piping/equipment associated with nb application
Structural work for one story maintenance and operation pre-fabricated 968 sf new building in east river park.
New 8'-0 construction wood fence
General renovation of 2-family house with repair/replace/new partition, door, ceiling, floor, painting work. no change in use, egress or occupancy.
Interior alterations to create a duplex between the basement and first floor for a new C of O. to clear violation 35484316H.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Gut-rehab of structure including new windows, doors, partitions and interior finishes.
Renovation of existing cellar, 1st and 2nd floor with general construction:new partitions, doors, flooring and cosmetic work; replace concrete stair at front and rear yard. no chan…
The construction of a new concrete platform for proposed lula system. no change to use, egress or occupancy. application filed to supersede x01040350-s4.
Proposed new 8 story + cellar residential use building.
Underpinning filed in conjunction with nb job number q01283772-i1.
Proposed new building , 3-story, 3-family with cellar
new on-site curb with fence installation
Curb cut work type in conjunction with nb# b01266301-i1
Proposed new footing/foundations for (4) new lightpoles to be installed in holcombe rucker park. all as per plans filed herewith. no change in use, egress or occupancy.
Equipment use (cars 3&4): dual personnel hoists. car # 3 shall be 7000# & car # 4 shall be 5404# capacity during nb const, filed sep. hoists shall comply with ch #33 of the nyc bc.…
Herewith filing for FOUNDATION, EXCAVATION & STRUCTURAL plans for 2-story new building. Subsequent to NB application Q08040097-i1.
Install support of excavation as per plans submitted for foundation footing and wall installation associated with NB 421763112 Arverne Library Annex Building. No Change to use, egr…
Convertion from 1 to 2 family, new 2nd floor and attic vertical extension and general renovation
Filing for DOB denial for BSA - new 3 story building with cellar
Installation of temporary roof protection as per plans in conjunction with nb construction @ adjacent property. no change in use, egress or occupancy. roof protection to comply wit…