Search Building Permits
2,850 permits · HVAC · NY
Installation of new HVAC equipment and ductwork
Oil to gas conversion, install new boiler and indirect hw tank with reconnection to existing distribution in cellar.
Modifications to the existing HVAC system on the the 34th floor as per plans. No changes to Use, Egress, or occupancy.
Filing for Fuel Storage Tank for Generator.
Mechanical systems in conjunction with alt-co job number # b07994345-i1. installation of (3) air conditioner units and minor mechanical work as per plan.
Modifications to existing HVAC system and ductwork including installation of new AC units. No change in use, egress or occupancy.
Herewith filing boiler and tank removal as per plans. no change in use, egress or occupancy
2A Elev.: Modification of HVAC equipment and ductwork to accommodate alteration to the existing elevator doors and lobbies as per plans. no change to use, egress or occupancy.
1 BOILER REPLACED ON INITIAL FILING, 1 NEW BOILER INSTALL ON SUBSEQUENST FILNG. IN CONJUNCTION TO PL FILING FOR GAS PIPING M01055178-I1 no change to use egress or occupancy ALL WORK PER PLAN
Registering one electric hot water heater, one warm air furnace, one gas residential gas stove and gas piping as per plans filed herewith.
Installation of new boiler at cellar floor. no change to use, egress or occupancy. application previously filed & approved under x00490662-z1, however was filed as replacement instead of new installat...
ERIOR RENOVATION OF UNIT 2E INCLUDING REMOVAL OF NON-LOAD-BEARING INTERIOR PARTITIONS IN THE KITCHEN AREA AND INSTALLATION OF NEW STEPS LEADING TO THE SUNKEN LIVING ROOM, installing new split HVAC as...
1A Elev.: Modification of HVAC equipment and ductwork to accommodate alteration to the existing elevator doors and lobbies as per plans. no change to use, egress or occupancy.
Install (7) new boilers for existing 5-family dwelling and (1) commerical store in cellar as per plan. no change in use, egress or occupancyunder this application.
Building 6 - provide loose lintel for louver opening of masonry wall. repair and extend ex. concrete pad. provide boiler access platform.
Modification to existing HVAC systems as per plans filed herewith. No change in use, egress or occupancy.
Modify existing conditions for the installation associated with the new Boilers to be installed, cut,patch,paint, all to match existing as per plans.
Renovation of cellar mechanical room - nycha boilers
Proposed installation of HVAC units, exhaust duct, SS Hood, and exhaust fan, including all incidental general construction work associated with the mechanical installation.
File plumbing work to remove boiler&hwh and install new comb. tankless boilers as per plan. no change in use, egress or occupancy.