168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of partitions and storefronts and change use to retail and restaurants. Install stair to roof and build new bulkhead.
Propose sprinkler scope of work filed in conjunction with alt 1 # 121188712, work include install new heads; 8 hds @ subcellar, 9 hds @ cellar, 7 hds @ 1 fl, 8 hds each @ 2nd thru…
P.S. 184-Q: Replacement of select roofing systems, roofing repairs, repairs to existing masonry, extension of roof guardrails, scuppers at roof, stair railing and areaway grating r…
Work performed on the AT&T rooftop antenna located above TEP. Removal of existing screen wall on roof. Repair and reinforcement of bulkheads on roof. No change to occupancy, use, o…
Filed herewith to propose raising of roof level, new use and egress of stairs and elevator
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Roof structure will consist of st beams moment connected w/ taperedcantilevered st sections alongside hsstubes & thermal break as nosingbuild-up. concr slab on metal deckwill suppo…
Roof structure will consist of st beams moment connected w/ taperedcantilevered st sections alongside hsstubes & thermal break as nosingbuild-up. concr slab on metal deckwill suppo…
Installation of roof protection and roof overhead protection. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Direct replacement of (4) chillers on the roof on existing steel dunnage. All existing duct work to remain. No change in use egress and occupancy.
Filing alteration co for change of use from offices to residential use, work on cellar, 1st, 2-11, 13th fl, roof with related construction and finishes. project is part nyc develop…
Interior building renovations to include drywall partitions drop ceiling ,floor / roof joist stairs and roof bulkhead. heat pump 4-story rear extension, footing and foundation ad t…
exterior facade repairs, waterproofing, pointing, brick repairs
Application filed to install new type i kitchen hoods on 1stfloor, rooftop exhaust fan, make-up air fan and ductwork asper plans. fire suppression system filed separately with thef…
Proposed horizontal enlargement and conversion from recreation room to a residential unit on roof/ 6th floor, new community facility use on 2nd floor for an existing mixed resident…
Existing 2-family house with interior renovation on partitionwork at the cellar, basement,1st, 2nd, 3rd,roof and the rear yard under thisapplication.2. no change in use, means of e…
Reinforcement of the existing roof structure for new bulkhead and new roof deck. no change in use, occupancy, or egress.
Renovate existing mixed use building including kitchens, bathrooms and finishes. Provide 2 hr. ceiling at commercial space and rebuild fire damage roof bulkhead. No change of use,…
Renovation at 1st, 2nd , 3rd & Roof floors of Class A residential Apartments. No change to use, egress or occupancy under this application. Proposed work shall conform with old-cod…
Remove 2nd story on existing garage,restore garage to legal conditions,show roof deck at 2nd floor,show ordinary use in cellar,work include frame wall removal and installation. no…
Installation of mechanical equipment (air conditioning with piping and controls and toilet/kitchen exhaust system). scope of work inlcudes providing split ac units w/ roof condense…