14,263 permits matching "hvac"
Brahman 3318 B Right New - 2 Story SFR CONDOMINUM w/ 4 bedrooms 2.5 bathrooms attached 2 car garage covered entry porch and patio FFE: 681.82 Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld heigh...
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2.5 Ton Vertical Gas System
Installation of temp Tent, platforms, no alt to exist structures for Tony Awards Red Carpet. A TPA permit is required. Producer is responsible to monitor site safety & implement HWAP. All production e...
Replacement of complete existing central heat and air system with or without duct work
Mechanical modifications taking place on the 39th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
ePlan: Commercial Expedited Review - Interior Remodel of Existing Admin Areas Phase 2.
Replace gas burner on existing boiler as per plans filed in conjunction with laa m01342319. no change to use, occupancy or egress.
Mechanical specifications filed in conjunction with gc application b00683623-i1
Mechanical modifications taking place on the 32nd floor (33rd floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.
Replacement of complete existing central heat and air system with or without duct work
installation of new mechanical system in entire building
Removal of existing tank room mechanical, heating and domestic hot water system. installation of new hot water system and associated piping and ducts. no change in use egress or occupancy.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Filing herewith mechanical work for community facility fit out as per plans. no change is use, egress, or occupancy.
***Timed Virtual Inspection: 04/09/2026 @ 8 AM*** Replacement of complete existing central heat and air system with or without duct work
Interior renovation of the existing apartment #16e. removal of non-bearing partition, new interior finishes, new ductless air conditioning system. no change in use, occupancy or egress.
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2 TON HORIZONTAL GAS SYSTEM LIKE FOR LIKE: 2 TON HROIZONTAL GAS SYSTEM **TWO SYSTEM CHANGE OUT**
Replacement of complete existing central heat and air system with or without duct work