2,095 permits · Demolition · NY
Installation of Wall Ties in conjunction with NYC HPD OP32 Emergency Demolition filed at 1389 East 92 Street, FD# B01358115-I1, DEC# 19966
Proposed to cut, cap and demolish sprinkler system in conjunction with full demo job # b01208841. no change to use, egress or occupancy under this application.
Minor demolition with installation of new partitions, doors, ceilings and finishes on the 31st floor (Electra USA) as per plans. No change to use, egress or occupancy.
Herewith filing for demolition of the subcellar #1 as per plans. no change to use, occupancy, or egress under this application.
Demolish and repair collapsed block east wall and repair north and south block wall. no change on use, egress or occupancy under this application.
8'-0 high construction fence to be erected along the perimeter of structure to undergo demolition and construction operations.
Filed for the interior demolition and renovation of commercial space only at 1st floor of a mixed use 3-story building. Application filed in response to ECB # 35298267L, 35584931H, 35348546R, 35299145...
Demolition of existing non-load bearing partitions w/in apartment 20g
Mechanical Design for: 1) Replacement of chillers and demolition of cooling towers 2) Installing fully variable reheat hot water system 3) Upgrading BMS 4) Recovering waste heat from the cold storage...
Partial demolition on existing two-family four-story frame residential building with basment & cellar.no change of building bulk,occupancy or egress.
Full Demolition of 1-story wood framed structure
Full Demolition of 1-story wood framed structure
Filed pursuant to article i, chapter v of the nyc zoning resolution and article 7b of the nys multiple dwelling law for residential conversion including partial demolition and permitted reconstruction...
Interior demolition of non structural partitions and interior renovation of existing apartment h-206 on 2nd floor no change in use egress or occupancy
full demolition of house
Interior renovation @ 2nd fl apartment, work to partitions demolition, new partitions, replace floor and interior finishes throughout only. no change in use egress, or occupancy..
Convert 3 family apartment building to 2 family house. Demolition in rear yard and rebuild as stepped 2 level addition. Construct 3-level winder stair and new bulkhead for room access. Replace windows...
Full Demolition of a 1-story wood framed structure
Proposed temporary construction for the demolition of the existing structure and the new construction.
Interior renovation @ 2nd fl apartment, work to partitions demolition, new partitions, replace floor and interior finishes throughout only. no change in use egress, or occupancy..
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com