168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Interior finish out in an existing commercial space for a restaurant. Building 12
Filing herewith drawings indicating modifications to mechanical systems on the 7th floor. No changes in use, egress, or occupancy.
Installation of new 4-ton system for commercial space. no change in egress or occupancy.
A/c disconnect box
Retail automotive tire & service i.e. alignment, shocks, brakes, general mechanical and maintenance services, oil change.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Remove (2) low pressure steam boilers & replace with (2) new low pressure hot water boilers. replace (2) new combination #2 oil/nat gas burners. replace associated pumps and piping…
Mechanical work as shown on plans
Modification to hvac system including ductwok and new split units
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition
Interior renovaiton existing commercial space with partition and mechanical work on 1st floor. no change in use, egress or occupancy.
Proposed replacing of indoor hvac heat pump equipment @apt. 7e . mechanical work as per plans. no change in use, egress or occupancy.
Carlos nino
Mechanical permit
AC Replacement
Supply install hvac
Interior remodel of existing mercantile space.
Replacement of complete existing central heat and air system with or without duct work
Mechanical work to accommodate new tenant at existing commercial space. New HVAC. No change to use egress or occupancy.
Cooling tower replacement as per plans. No change in use, egress, or occupancy.
vollyball