168,000+ permits across 13 states. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of new pizza oven hood, and modification of existing HVAC system. No change in use egress nor occupancy.
provide new central air coinditioning systems for the 4th, 5th & 6th floors. no change in use or egress.
Montefiore medical center interior renovation first floor - mechanical modifications as per plans filed herewith. no change in use, egress, or occupancy.
Proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI)
Proposed new two (2) story, two (2) family building with cellar. obtain a certificate of occupancy.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
full demolition of one-story structure, using mechanical means.
Mechanical modifications taking place on cellar as per plans filed herewith. no change in use, egress, or occupancy.
Mechanical work at existing eating and drinking est. installation of erv. no change in use, egress or occupancy.
Modification of mechanical system for cellar and 1st floors only in conjunction with alterationapplication #m01345952-i1
Installation of sub-slab depressurization system in accordance with the NYCOER-approved Remedial Action Work Plan (OER Project Number 12TMP0188Q, 12EH-N188Q)
Propose removal of existing boilers and indirect hot water heaters and exhaust fans as per plan. install hvac and ventilation system as per plan, filed in conjunction with alt1 # 1…
Registration and legalization of two boilers at oakwook beach WRRFs dewatering building.
Mechanical work in conjunction to the ALT-CO application M01340670-I1
Modification to existing HVAC system, add Air handlers, duct work and fans
Installation of temp platform, partitions, production equipment no alt to exist structures for Whitney Gala. TPA permit required. Producer is responsible to monitor site safety. Al…
Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
Proposed new two (2) story, two (2) family building with cellar. obtain a certificate of occupancy.
Provide all new mechanical equipment for heating and ventilation for new 11-story mixed use building.
Providing new mobile ventless unit at existing commercial kitchen of existing restaurant. no physical work to be done. there will be no change in use, egress or occupancy.
(cars a,b,c&d): temporary hoist run-back structure during bldg alteration, filed sep. run-back structure shall comply with chapter #33 of the nyc building code. no change in use, o…